Solar plant: site data

Solar power plant in Hnylets, Zvenyhorodskyi Raion, Cherkasy Oblast

Hnylets: 1,146 kWh per kWp a year, tilt 36° 3° east of south (PVGIS). Exactly the oblast median (1,144). #45 of 197 in the rayon, #312 of 731 in the oblast.

Shpola, the rayon centre, is 36 km away. 216 m above sea level. 18 km away: Lysyanka, the nearest bigger centre, the same 1,148. Snow and wind from the nearest regional centre in the DBN — Черкаси, 74 km. 11.16 m between rows, pitch 15.03 m (latitude 49.3°).

Yield of 1 kWp
1,146kWh/year
Tilt
36°3° east of south
10 kW
11,455kWh/year
Row pitch
15.03m · GCR 0.32
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Hnylets

The designer opens with this place’s coordinates, latitude 49.3° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 74 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan55Feb96Mar118Apr139May143Jun148Jul144Aug116Sep87Oct38Nov27Dec

July: 148 kWh/kWp, December: 27 — 5.5 times less.

December: 27 against 28 in the oblast, 3.6% less.

Hnylets: plants, kWh
kWpA yearJulyDecember
55,728740135
1011,4551,480270
1517,1832,220405

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zvenyhorodskyi RaionCherkasy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.