Ground frame for 10 Znshine ZXMR-UPLDD132-610 (N-type, rectangular cells) panels (2×5)

2 rows of 5 panels, 6.10 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
6.10kW
Steel
243.9kg
Posts
8
Bolts
74
Materials
31,869₴
Yield
6,947kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Znshine ZXMR-UPLDD132-610 (N-type, rectangular cells) panel and the 2 × 5 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 60×40×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm4 frames, pitch up to 1,780 mm
Posts888
Footings (bored concrete)8 pcs, Ø400 mm, depth 1,100 mm8 pcs, Ø350 mm, depth 1,100 mm8 pcs, Ø300 mm, depth 1,300 mm
Concrete1.22 m³0.93 m³0.81 m³
Tilt30°30°30°
Panel bottom / post top600 / 2,287 mm600 / 2,287 mm600 / 2,287 mm
Panel field size5,890 × 3,102 mm5,890 × 3,102 mm5,890 × 3,102 mm
Row spacing between tables (no shade on 21 December)10,730 mm at noon · 12,070 mm ±2 h11,890 mm at noon · 13,740 mm ±2 h13,040 mm at noon · 15,490 mm ±2 h
Steel228.2 kg243.9 kg249.6 kg
BoltsM10 — 50, M8 — 24M10 — 50, M8 — 24M10 — 50, M8 — 24
Panel clampsend 8, middle 16end 8, middle 16end 8, middle 16
Materials30,919 UAH31,869 UAH34,083 UAH
With installation and delivery47,399 UAH48,559 UAH50,773 UAH
Per 1 kW7,770 UAH/kW7,960 UAH/kW8,323 UAH/kW
Yield1,266 kWh/kW · 7,725 kWh/year1,139 kWh/kW · 6,947 kWh/year1,043 kWh/kW · 6,363 kWh/year
Strength σ/fy52%71%76%
Deflection / (L/200)37%50%53%
Rafter strength84%74%80%
Post utilisation16%22%24%
Utilisation88%91%90%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 84%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø400 × 1 100: 0.138 m³ of concrete per post. Wind uplift on the front post ≈ 11.8 kN (with γ=1.5) vs ≈ 13.4 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø350 × 1 100: 0.106 m³ of concrete per post. Wind uplift on the front post ≈ 10.3 kN (with γ=1.5) vs ≈ 11.4 kN (concrete weight + soil friction, estimate) → 91%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.1 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 90%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,2744
П2Rear postTube 60×60×23,4124
Кр1Rafter (inclined beam)Tube 60×60×23,9244
Пк1Frame strutC-channel 60×40×21,8184
Х1Longitudinal brace (cross)C-channel 60×40×22,4354
Р1Purlin (rail)C-channel 60×40×25,8904
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——38
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——12
—End clamp 35 mm——8
—Mid clamp (30–40 mm)——16
—Bolt M8×55 + channel nut——24
—Concrete for 8 posts, Ø350×1100——0.93 m³

Profile cutting

16 bars of 6,000 mm, 79.0 m of profile in total.

  • Tube 60×60×28 bars
  • C-channel 60×40×28 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
31,869₴
With installation and delivery
48,559₴
Per 1 kW
7,960UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 19 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm8 bar21010,080
C-channel 60×40×2, stock length 6 000 mm8 bar23011,040
Bolt M10×140 cl. 8.8 set — frame, struts26 pcs22572
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors18 pcs22396
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts12 pcs27324
End clamp 35 mm8 pcs35280
Mid clamp (30–40 mm)16 pcs32512
Bolt M8×55 A2 + spring channel nut M827 pcs14378
Post base anchor pin (M10 / rebar Ø12)8 pcs20160
Borehole casing (roofing felt / PVC, 300 mm)8 pcs60480
Crushed stone 20–40 for the bottom of the boreholes0.08 m³90072
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow19 m35665
Module earthing clip (under the clamp)10 pcs20200
Cable clip, stainless30 pcs5150
Zinc paint / cold galvanising spray 400 ml1 pcs350350
Concrete M200 for posts0.93 m³3,8003,534
Rebar Ø10 (4 bars per post)42 m281,176
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 4 × 70 mm, 4 × 30 mm, 4 × 10 mm16 pcs00
Materials31,869

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 6,947 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.