Section of the table from the Solispec engine (median zone — Cherkasy)

Yingli

Ground frame for 10 Yingli PANDA 3.0 Pro YL630CF66i/2 panels (1×10)

1 row of 10 panels, 6.30 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
6.30kW
Steel
251.0kg
Posts
14
Bolts
96
Materials
35,224₴
Yield
7,174kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Yingli PANDA 3.0 Pro YL630CF66i/2 panel and the 1 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2Tube 60×60×2Tube 60×60×2
Purlins and bracesC-channel 60×40×2C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 2,200 mm7 frames, pitch up to 1,850 mm7 frames, pitch up to 1,850 mm
Posts121414
Footings (bored concrete)12 pcs, Ø300 mm, depth 900 mm14 pcs, Ø300 mm, depth 1,100 mm14 pcs, Ø300 mm, depth 1,300 mm
Concrete0.84 m³1.20 m³1.42 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,338 mm600 / 1,338 mm600 / 1,338 mm
Panel field size11,660 × 1,459 mm11,660 × 1,459 mm11,660 × 1,459 mm
Row spacing between tables (no shade on 21 December)5,350 mm at noon · 6,010 mm ±2 h5,920 mm at noon · 6,840 mm ±2 h6,490 mm at noon · 7,720 mm ±2 h
Steel221.7 kg251.0 kg261.1 kg
BoltsM10 — 66, M8 — 22M10 — 74, M8 — 22M10 — 74, M8 — 22
Panel clampsend 4, middle 18end 4, middle 18end 4, middle 18
Materials30,325 UAH35,224 UAH36,368 UAH
With installation and delivery47,505 UAH52,421 UAH53,565 UAH
Per 1 kW7,540 UAH/kW8,321 UAH/kW8,502 UAH/kW
Yield1,266 kWh/kW · 7,979 kWh/year1,139 kWh/kW · 7,174 kWh/year1,043 kWh/kW · 6,572 kWh/year
Strength σ/fy75%74%79%
Deflection / (L/200)65%54%58%
Rafter strength10%11%12%
Post utilisation6%7%8%
Utilisation81%49%40%
Depth vs frost depthokokok
Checks overallwith a cautionpassespasses

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø300 × 900: 0.064 m³ of concrete per post. Wind uplift on the front post ≈ 6.3 kN (with γ=1.5) vs ≈ 7.7 kN (concrete weight + soil friction, estimate) → 81%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,0227
П2Rear postTube 60×60×22,4637
Кр1Rafter (inclined beam)Tube 60×60×21,5227
Пк1Frame strutC-channel 60×40×29987
Х1Longitudinal brace (cross)C-channel 60×40×22,0074
Р1Purlin (rail)C-channel 60×40×26,0001
Р2Purlin (rail)C-channel 60×40×26,0001
Р3Purlin (rail)C-channel 60×40×25,6601
Р4Purlin (rail)C-channel 60×40×25,6601
—Bolt M10×140 / M10×80 set · frame and struts / purlins, braces, connectors——59
—Bolt M10×150 set · brace to post, strut to rafter — through spacer inserts——15
—End clamp 30 mm——4
—Mid clamp (30–40 mm)——18
—Bolt M8×50 + channel nut——22
—Concrete for 14 posts, Ø300×1100——1.20 m³

Profile cutting

16 bars of 6,000 mm, 80.4 m of profile in total.

  • Tube 60×60×29 bars
  • C-channel 60×40×27 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
35,224₴
With installation and delivery
52,421₴
Per 1 kW
8,321UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 20 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm9 bar21011,340
C-channel 60×40×2, stock length 6 000 mm7 bar2309,660
C-channel connector (splice plate L 300)2 pcs90180
Bolt M10×140 cl. 8.8 set — frame, struts43 pcs22946
Bolt M10×80 cl. 8.8 set — purlins, braces, connectors24 pcs22528
Bolt M10×150 cl. 8.8 set — strut to rafter, brace to post — through spacer inserts15 pcs27405
End clamp 30 mm4 pcs35140
Mid clamp (30–40 mm)18 pcs32576
Bolt M8×50 A2 + spring channel nut M825 pcs14350
Post base anchor pin (M10 / rebar Ø12)14 pcs20280
Borehole casing (roofing felt / PVC, 300 mm)14 pcs60840
Crushed stone 20–40 for the bottom of the boreholes0.10 m³90090
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow31 m351,085
Module earthing clip (under the clamp)10 pcs20200
Cable clip, stainless30 pcs5150
Zinc paint / cold galvanising spray 400 ml1 pcs350350
Concrete M200 for posts1.20 m³3,8004,560
Rebar Ø10 (4 bars per post)73 m282,044
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 7 × 70 mm, 4 × 30 mm, 7 × 10 mm22 pcs00
Materials35,224

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 7,174 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 1×10 layout with other panels

Next