Section of the table from the Solispec engine (median zone — Cherkasy)

Tongwei

Ground frame for 16 Tongwei TNC TWMNH-54HD510 panels (2×8)

2 rows of 8 panels, 8.16 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
8.16kW
Steel
288.5kg
Posts
10
Bolts
112
Materials
38,530₴
Yield
9,292kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Tongwei TNC TWMNH-54HD510 panel and the 2 × 8 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 60×40×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames6 frames, pitch up to 1,760 mm5 frames, pitch up to 2,170 mm5 frames, pitch up to 2,170 mm
Posts121010
Footings (bored concrete)12 pcs, Ø350 mm, depth 900 mm10 pcs, Ø300 mm, depth 1,300 mm10 pcs, Ø300 mm, depth 1,300 mm
Concrete1.14 m³1.01 m³1.01 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,997 mm600 / 1,981 mm600 / 1,981 mm
Panel field size9,352 × 2,562 mm9,352 × 2,571 mm9,352 × 2,571 mm
Row spacing between tables (no shade on 21 December)8,850 mm at noon · 9,940 mm ±2 h9,800 mm at noon · 11,320 mm ±2 h10,740 mm at noon · 12,770 mm ±2 h
Steel321.2 kg288.5 kg304.9 kg
BoltsM10 — 86, M8 — 36M10 — 76, M8 — 36M10 — 76, M8 — 36
Panel clampsend 8, middle 28end 8, middle 28end 8, middle 28
Materials38,185 UAH38,530 UAH40,425 UAH
With installation and delivery60,037 UAH60,100 UAH62,260 UAH
Per 1 kW7,357 UAH/kW7,365 UAH/kW7,630 UAH/kW
Yield1,266 kWh/kW · 10,334 kWh/year1,139 kWh/kW · 9,292 kWh/year1,043 kWh/kW · 8,512 kWh/year
Strength σ/fy74%86%92%
Deflection / (L/200)65%73%79%
Rafter strength37%95%66%
Post utilisation11%19%20%
Utilisation98%88%86%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 900: 0.087 m³ of concrete per post. Wind uplift on the front post ≈ 9.1 kN (with γ=1.5) vs ≈ 9.3 kN (concrete weight + soil friction, estimate) → 98%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.8 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 88%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.6 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 86%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 170 mm, 5 frames. Purlin C-channel 60×40×2: strength 86%, deflection 73% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 170 mm, 5 frames. Purlin C-channel 60×40×2: strength 92%, deflection 79% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 892, cantilever 685 mm → strength 95%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,3605
П2Rear postTube 60×60×23,3065
Кр1Rafter (inclined beam)C-channel 60×40×23,2625
Пк1Frame strutC-channel 60×40×21,5515
Х1Longitudinal brace (cross)C-channel 60×40×22,5704
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×23,3522
Р4Purlin (rail)C-channel 60×40×23,3522
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——20
—Bolt M10×90 set · strut to post — through spacer inserts——5
—Bolt M10×120 set · post–rafter——20
—Bolt M10×130 set · strut to rafter — through spacer inserts——5
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——28
—Bolt M8×50 + channel nut——36
—Concrete for 10 posts, Ø300×1300——1.01 m³

Profile cutting

18 bars of 6,000 mm, 100.1 m of profile in total.

  • Tube 60×60×25 bars
  • C-channel 60×40×213 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
38,530₴
With installation and delivery
60,100₴
Per 1 kW
7,365UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm5 bar2106,300
C-channel 60×40×2, stock length 6 000 mm13 bar23017,940
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors18 pcs22396
Bolt M10×80 cl. 8.8 set — purlin to rafter28 pcs27756
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts5 pcs27135
Bolt M10×120 cl. 8.8 set — post–rafter20 pcs27540
Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts5 pcs27135
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)28 pcs32896
Bolt M8×50 A2 + spring channel nut M840 pcs14560
Post base anchor pin (M10 / rebar Ø12)10 pcs20200
Borehole casing (roofing felt / PVC, 300 mm)10 pcs60600
Crushed stone 20–40 for the bottom of the boreholes0.07 m³90063
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow25 m35875
Module earthing clip (under the clamp)16 pcs20320
Cable clip, stainless48 pcs5240
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.01 m³3,8003,838
Rebar Ø10 (4 bars per post)60 m281,680
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 5 × 70 mm, 4 × 30 mm, 5 × 10 mm18 pcs00
Materials38,530

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 9,292 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.