Section of the table from the Solispec engine (median zone — Cherkasy)

Tongwei

Ground frame for 20 Tongwei TNC TWMNH-54HD510 panels (2×10)

2 rows of 10 panels, 10.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
10.20kW
Steel
345.7kg
Posts
12
Bolts
130
Materials
46,154₴
Yield
11,616kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the Tongwei TNC TWMNH-54HD510 panel and the 2 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersTube 60×60×2C-channel 60×40×2Tube 60×60×2
Purlins and bracesC-channel 41×41×2.5C-channel 60×40×2C-channel 60×40×2
Frames8 frames, pitch up to 1,600 mm6 frames, pitch up to 2,200 mm6 frames, pitch up to 2,200 mm
Posts161212
Footings (bored concrete)16 pcs, Ø350 mm, depth 900 mm12 pcs, Ø300 mm, depth 1,300 mm12 pcs, Ø300 mm, depth 1,300 mm
Concrete1.52 m³1.21 m³1.21 m³
Tilt30°30°30°
Panel bottom / post top600 / 1,997 mm600 / 1,981 mm600 / 1,981 mm
Panel field size11,660 × 2,562 mm11,660 × 2,571 mm11,660 × 2,571 mm
Row spacing between tables (no shade on 21 December)8,850 mm at noon · 9,940 mm ±2 h9,800 mm at noon · 11,320 mm ±2 h10,740 mm at noon · 12,770 mm ±2 h
Steel410.8 kg345.7 kg365.3 kg
BoltsM10 — 106, M8 — 44M10 — 86, M8 — 44M10 — 86, M8 — 44
Panel clampsend 8, middle 36end 8, middle 36end 8, middle 36
Materials47,886 UAH46,154 UAH47,879 UAH
With installation and delivery74,806 UAH72,791 UAH74,831 UAH
Per 1 kW7,334 UAH/kW7,136 UAH/kW7,336 UAH/kW
Yield1,266 kWh/kW · 12,918 kWh/year1,139 kWh/kW · 11,616 kWh/year1,043 kWh/kW · 10,640 kWh/year
Strength σ/fy61%88%95%
Deflection / (L/200)48%76%82%
Rafter strength33%96%67%
Post utilisation10%19%21%
Utilisation89%89%87%
Depth vs frost depthokokok
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø350 × 900: 0.087 m³ of concrete per post. Wind uplift on the front post ≈ 8.3 kN (with γ=1.5) vs ≈ 9.3 kN (concrete weight + soil friction, estimate) → 89%.Cherkasy: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 10.0 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 89%.Chernihiv: Foundation Ø300 × 1 300: 0.092 m³ of concrete per post. Wind uplift on the front post ≈ 9.7 kN (with γ=1.5) vs ≈ 11.2 kN (concrete weight + soil friction, estimate) → 87%.
  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Cherkasy: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 88%, deflection 76% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 2 200 mm, 6 frames. Purlin C-channel 60×40×2: strength 95%, deflection 82% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 60×40×2: span between posts 1 892, cantilever 685 mm → strength 96%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,3606
П2Rear postTube 60×60×23,3066
Кр1Rafter (inclined beam)C-channel 60×40×23,2626
Пк1Frame strutC-channel 60×40×21,5516
Х1Longitudinal brace (cross)C-channel 60×40×22,5964
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×25,6602
Р4Purlin (rail)C-channel 60×40×25,6602
—Bolt M10×25 set · purlins, braces, connectors——18
—Bolt M10×80 set · purlin to rafter——24
—Bolt M10×90 set · strut to post — through spacer inserts——6
—Bolt M10×120 set · post–rafter——24
—Bolt M10×130 set · strut to rafter — through spacer inserts——6
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——36
—Bolt M8×50 + channel nut——44
—Concrete for 12 posts, Ø300×1300——1.21 m³

Profile cutting

22 bars of 6,000 mm, 119.9 m of profile in total.

  • Tube 60×60×26 bars
  • C-channel 60×40×216 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
46,154₴
With installation and delivery
72,791₴
Per 1 kW
7,136UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 23 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm6 bar2107,560
C-channel 60×40×2, stock length 6 000 mm16 bar23022,080
C-channel connector (splice plate L 300)4 pcs90360
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors18 pcs22396
Bolt M10×80 cl. 8.8 set — purlin to rafter33 pcs27891
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts6 pcs27162
Bolt M10×120 cl. 8.8 set — post–rafter24 pcs27648
Bolt M10×130 cl. 8.8 set — strut to rafter — through spacer inserts6 pcs27162
Bolt M10×150 cl. 8.8 set — brace to post — through spacer inserts8 pcs27216
End clamp 30 mm8 pcs35280
Mid clamp (30–40 mm)36 pcs321,152
Bolt M8×50 A2 + spring channel nut M849 pcs14686
Post base anchor pin (M10 / rebar Ø12)12 pcs20240
Borehole casing (roofing felt / PVC, 300 mm)12 pcs60720
Crushed stone 20–40 for the bottom of the boreholes0.08 m³90072
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow29 m351,015
Module earthing clip (under the clamp)20 pcs20400
Cable clip, stainless60 pcs5300
Zinc paint / cold galvanising spray 400 ml2 pcs350700
Concrete M200 for posts1.21 m³3,8004,598
Rebar Ø10 (4 bars per post)72 m282,016
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 6 × 70 mm, 4 × 30 mm, 6 × 10 mm20 pcs00
Materials46,154

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 11,616 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 2×10 layout with other panels

Next