Section of the table from the Solispec engine (median zone — Cherkasy)

JA Solar

Ground frame for 60 JA Solar JAM72D42-640/LB panels (3×20)

3 rows of 20 panels, 38.40 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
38.40kW
Steel
1,581.8kg
Posts
34
Bolts
514
Materials
205,920₴
Yield
43,729kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the JA Solar JAM72D42-640/LB panel and the 3 × 20 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames14 frames, pitch up to 1,740 mm17 frames, pitch up to 1,420 mm17 frames, pitch up to 1,420 mm
Posts283434
Footings (bored concrete)28 pcs, Ø450 mm, depth 1,500 mm34 pcs, Ø400 mm, depth 1,300 mm34 pcs, Ø350 mm, depth 1,500 mm
Concrete7.35 m³6.11 m³5.40 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,328 mm600 / 3,328 mm600 / 3,328 mm
Panel field size23,200 × 4,906 mm23,200 × 4,906 mm23,200 × 4,906 mm
Row spacing between tables (no shade on 21 December)16,680 mm at noon · 18,750 mm ±2 h18,480 mm at noon · 21,350 mm ±2 h20,260 mm at noon · 24,080 mm ±2 h
Steel1,394.0 kg1,581.8 kg1,606.3 kg
BoltsM10 — 334, M8 — 126M10 — 388, M8 — 126M10 — 388, M8 — 126
Panel clampsend 12, middle 114end 12, middle 114end 12, middle 114
Materials186,308 UAH205,920 UAH203,916 UAH
With installation and delivery282,700 UAH302,092 UAH300,088 UAH
Per 1 kW7,362 UAH/kW7,867 UAH/kW7,815 UAH/kW
Yield1,266 kWh/kW · 48,631 kWh/year1,139 kWh/kW · 43,729 kWh/year1,043 kWh/kW · 40,056 kWh/year
Strength σ/fy99%88%94%
Deflection / (L/200)85%61%66%
Rafter strength83%91%97%
Post utilisation44%48%51%
Utilisation96%91%91%
Depth vs frost depthokokok
Bolt utilisation37%40%43%
Plate section0%0%0%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 740 mm, 14 frames. Purlin C-channel 41×41×2.5: strength 99%, deflection 85% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 420 mm, 17 frames. Purlin C-channel 41×41×2.5: strength 88%, deflection 61% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 420 mm, 17 frames. Purlin C-channel 41×41×2.5: strength 94%, deflection 66% of L/200 (snow on panel 1 106 Pa).
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Kherson: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 83%.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 91%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 97%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 20.1 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 96%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.4 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 91%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 14.0 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 91%.
  • Stock length, mmKherson: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 6.65 kN vs 18.00 kN (37%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 7.23 kN vs 18.00 kN (40%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 7.73 kN vs 18.00 kN (43%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,75717
П2Rear postTube 60×60×24,65317
Кр1аRafter (inclined beam)C-channel 100×50×2.51,96017
Кр1бRafter (inclined beam)C-channel 100×50×2.54,57517
Н1Rafter splice plateC-channel 100×50×2.530017
Пк1Frame strutC-channel 41×41×2.52,73917
Пк2Front frame strutC-channel 41×41×2.53,63317
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0374
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.56,0003
Р4Purlin (rail)C-channel 41×41×2.56,0003
Р5Purlin (rail)C-channel 41×41×2.56,0003
Р6Purlin (rail)C-channel 41×41×2.56,0003
Р7Purlin (rail)C-channel 41×41×2.55,2003
Р8Purlin (rail)C-channel 41×41×2.55,2003
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——89
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——17
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——102
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——85
—Bolt M10×140 set · strut to rafter — through spacer inserts——17
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——68
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——114
—Bolt M8×50 + channel nut——126
—Concrete for 34 posts, Ø400×1300——6.11 m³

Profile cutting

101 bars of 6,000 mm, 501.8 m of profile in total.

  • Tube 60×60×226 bars
  • C-channel 100×50×2.523 bars
  • C-channel 41×41×2.552 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
205,920₴
With installation and delivery
302,092₴
Per 1 kW
7,867UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm26 bar21032,760
C-channel 100×50×2.5, stock length 6 000 mm23 bar38052,440
C-channel 41×41×2.5, stock length 6 000 mm52 bar20062,400
C-channel connector (splice plate L 300)18 pcs901,620
Bolt M10×80 cl. 8.8 set — frame, struts17 pcs22374
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors72 pcs221,584
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts17 pcs27459
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter141 pcs273,807
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts85 pcs272,295
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts17 pcs27459
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)68 pcs221,496
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)114 pcs323,648
Bolt M8×50 A2 + spring channel nut M8139 pcs141,946
Post base anchor pin (M10 / rebar Ø12)34 pcs20680
Borehole casing (roofing felt / PVC, 300 mm)34 pcs602,040
Crushed stone 20–40 for the bottom of the boreholes0.43 m³900387
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow63 m352,205
Module earthing clip (under the clamp)60 pcs201,200
Cable clip, stainless180 pcs5900
Zinc paint / cold galvanising spray 400 ml6 pcs3502,100
Concrete M200 for posts6.11 m³3,80023,218
Rebar Ø10 (4 bars per post)204 m285,712
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 17 × 70 mm, 17 × 50 mm, 4 × 30 mm, 17 × 10 mm59 pcs00
Materials205,920

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 43,729 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.

Other layouts of this panel

The 3×20 layout with other panels

Next