Section of the table from the Solispec engine (median zone — Cherkasy)

JA Solar

Ground frame for 30 JA Solar JAM72D42-640/LB panels (3×10)

3 rows of 10 panels, 19.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.

Power
19.20kW
Steel
842.5kg
Posts
18
Bolts
262
Materials
109,567₴
Yield
21,865kWh/year

Figures for the median zone (Cherkasy); all three zones are in the table below.

Ground frame designer

Open this frame in the builder

The builder opens with the JA Solar JAM72D42-640/LB panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Three snow and wind zones

The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.

ParameterLow loadKherson · S₀ 760 · W₀ 480Median loadCherkasy · S₀ 1,520 · W₀ 420High loadChernihiv · S₀ 1,720 · W₀ 410
PostsTube 60×60×2Tube 60×60×2Tube 60×60×2
RaftersC-channel 100×50×2.5C-channel 100×50×2.5C-channel 100×50×2.5
Purlins and bracesC-channel 41×41×2.5C-channel 41×41×2.5C-channel 41×41×2.5
Frames8 frames, pitch up to 1,600 mm9 frames, pitch up to 1,400 mm9 frames, pitch up to 1,400 mm
Posts161818
Footings (bored concrete)16 pcs, Ø450 mm, depth 1,500 mm18 pcs, Ø400 mm, depth 1,300 mm18 pcs, Ø350 mm, depth 1,500 mm
Concrete4.20 m³3.24 m³2.86 m³
Tilt30°30°30°
Panel bottom / post top600 / 3,328 mm600 / 3,328 mm600 / 3,328 mm
Panel field size11,660 × 4,906 mm11,660 × 4,906 mm11,660 × 4,906 mm
Row spacing between tables (no shade on 21 December)16,680 mm at noon · 18,750 mm ±2 h18,480 mm at noon · 21,350 mm ±2 h20,260 mm at noon · 24,080 mm ±2 h
Steel785.1 kg842.5 kg855.4 kg
BoltsM10 — 178, M8 — 66M10 — 196, M8 — 66M10 — 196, M8 — 66
Panel clampsend 12, middle 54end 12, middle 54end 12, middle 54
Materials105,354 UAH109,567 UAH108,527 UAH
With installation and delivery154,238 UAH158,354 UAH157,314 UAH
Per 1 kW8,033 UAH/kW8,248 UAH/kW8,193 UAH/kW
Yield1,266 kWh/kW · 24,315 kWh/year1,139 kWh/kW · 21,865 kWh/year1,043 kWh/kW · 20,028 kWh/year
Strength σ/fy83%85%91%
Deflection / (L/200)66%59%63%
Rafter strength77%89%96%
Post utilisation41%47%51%
Utilisation88%90%89%
Depth vs frost depthokokok
Bolt utilisation34%40%42%
Plate section0%0%0%
Not includedengineer to checkengineer to checkengineer to check
Checks overallwith a cautionwith a cautionwith a caution

Checks and cautions

Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.

  • Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 600 mm, 8 frames. Purlin C-channel 41×41×2.5: strength 83%, deflection 66% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 400 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 85%, deflection 59% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 400 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 91%, deflection 63% of L/200 (snow on panel 1 106 Pa).
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 18.5 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.2 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 90%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 13.8 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 89%.
  • Stock length, mmKherson: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 6.12 kN vs 18.00 kN (34%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 7.13 kN vs 18.00 kN (40%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 7.62 kN vs 18.00 kN (42%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 89%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 96%.

Bill of materials

The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,7579
П2Rear postTube 60×60×24,6539
Кр1аRafter (inclined beam)C-channel 100×50×2.51,9609
Кр1бRafter (inclined beam)C-channel 100×50×2.54,5759
Н1Rafter splice plateC-channel 100×50×2.53009
Пк1Frame strutC-channel 41×41×2.52,7399
Пк2Front frame strutC-channel 41×41×2.53,6339
Х1Longitudinal brace (cross)C-channel 41×41×2.53,0274
Р1Purlin (rail)C-channel 41×41×2.56,0003
Р2Purlin (rail)C-channel 41×41×2.56,0003
Р3Purlin (rail)C-channel 41×41×2.55,6603
Р4Purlin (rail)C-channel 41×41×2.55,6603
—Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors——33
—Bolt M10×65 set · brace crossing——2
—Bolt M10×90 set · strut to post — through spacer inserts——9
—Bolt M10×110 set · brace to post — through spacer inserts——4
—Bolt M10×120 set · purlin to rafter——54
—Bolt M10×130 set · post–rafter, strut to post — through spacer inserts——45
—Bolt M10×140 set · strut to rafter — through spacer inserts——9
—Bolt M10×160 set · brace to post — through spacer inserts——4
—Bolt M10×25 set · rafter splice (plate Н1)——36
—End clamp 30 mm——12
—Mid clamp (30–40 mm)——54
—Bolt M8×50 + channel nut——66
—Concrete for 18 posts, Ø400×1300——3.23 m³

Profile cutting

54 bars of 6,000 mm, 267.6 m of profile in total.

  • Tube 60×60×214 bars
  • C-channel 100×50×2.512 bars
  • C-channel 41×41×2.528 bars

Estimated cost

The engine's materials estimate for the median zone (Cherkasy).

Materials
109,567₴
With installation and delivery
158,354₴
Per 1 kW
8,248UAH/kW

Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

All 28 lines of the engine's estimate, with prices
ItemQuantityPrice, UAHSum, UAH
Tube 60×60×2, stock length 6 000 mm14 bar21017,640
C-channel 100×50×2.5, stock length 6 000 mm12 bar38027,360
C-channel 41×41×2.5, stock length 6 000 mm28 bar20033,600
C-channel connector (splice plate L 300)6 pcs90540
Bolt M10×80 cl. 8.8 set — frame, struts9 pcs22198
Bolt M10×25 cl. 8.8 set — purlins, braces, connectors24 pcs22528
Bolt M10×65 cl. 8.8 set — brace crossing2 pcs2754
Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts9 pcs27243
Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×120 cl. 8.8 set — purlin to rafter74 pcs271,998
Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts45 pcs271,215
Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts9 pcs27243
Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts4 pcs27108
Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1)36 pcs22792
End clamp 30 mm12 pcs35420
Mid clamp (30–40 mm)54 pcs321,728
Bolt M8×50 A2 + spring channel nut M873 pcs141,022
Post base anchor pin (M10 / rebar Ø12)18 pcs20360
Borehole casing (roofing felt / PVC, 300 mm)18 pcs601,080
Crushed stone 20–40 for the bottom of the boreholes0.23 m³900207
Earth electrode: 2 rods Ø16×1.5 m + strip 40×41 set1,5001,500
Wire PV-3 6 mm² green-yellow35 m351,225
Module earthing clip (under the clamp)30 pcs20600
Cable clip, stainless90 pcs5450
Zinc paint / cold galvanising spray 400 ml3 pcs3501,050
Concrete M200 for posts3.23 m³3,80012,274
Rebar Ø10 (4 bars per post)108 m283,024
Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 9 × 70 mm, 9 × 50 mm, 4 × 30 mm, 9 × 10 mm35 pcs00
Materials109,567

Yield

Yield: 1,139 kWh per 1 kW a year, ≈ 21,865 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.