JA Solar
Ground frame for 30 JA Solar JAM72D42-640/LB panels (3×10)
3 rows of 10 panels, 19.20 kW. The Solispec engine chose the profiles, the frame pitch and the footings for three snow and wind zones: Kherson has the lowest load of the regional centres, Cherkasy the median, Chernihiv the highest.
- Power
- 19.20kW
- Steel
- 842.5kg
- Posts
- 18
- Bolts
- 262
- Materials
- 109,567₴
- Yield
- 21,865kWh/year
Figures for the median zone (Cherkasy); all three zones are in the table below.
Ground frame designer
Open this frame in the builder
The builder opens with the JA Solar JAM72D42-640/LB panel and the 3 × 10 layout; site — Cherkasy. Change the site, the tilt or the profiles and the checks and estimate are recalculated.
- No sign-up
- Snow and wind check
- Drawings and estimate
Three snow and wind zones
The same table designed for three regional centres: with the lowest, the median and the highest combined snow and wind load under DBN V.1.2-2:2006. For another site, open the frame in the builder.
| Parameter | Low loadKherson · S₀ 760 · W₀ 480 | Median loadCherkasy · S₀ 1,520 · W₀ 420 | High loadChernihiv · S₀ 1,720 · W₀ 410 |
|---|---|---|---|
| Posts | Tube 60×60×2 | Tube 60×60×2 | Tube 60×60×2 |
| Rafters | C-channel 100×50×2.5 | C-channel 100×50×2.5 | C-channel 100×50×2.5 |
| Purlins and braces | C-channel 41×41×2.5 | C-channel 41×41×2.5 | C-channel 41×41×2.5 |
| Frames | 8 frames, pitch up to 1,600 mm | 9 frames, pitch up to 1,400 mm | 9 frames, pitch up to 1,400 mm |
| Posts | 16 | 18 | 18 |
| Footings (bored concrete) | 16 pcs, Ø450 mm, depth 1,500 mm | 18 pcs, Ø400 mm, depth 1,300 mm | 18 pcs, Ø350 mm, depth 1,500 mm |
| Concrete | 4.20 m³ | 3.24 m³ | 2.86 m³ |
| Tilt | 30° | 30° | 30° |
| Panel bottom / post top | 600 / 3,328 mm | 600 / 3,328 mm | 600 / 3,328 mm |
| Panel field size | 11,660 × 4,906 mm | 11,660 × 4,906 mm | 11,660 × 4,906 mm |
| Row spacing between tables (no shade on 21 December) | 16,680 mm at noon · 18,750 mm ±2 h | 18,480 mm at noon · 21,350 mm ±2 h | 20,260 mm at noon · 24,080 mm ±2 h |
| Steel | 785.1 kg | 842.5 kg | 855.4 kg |
| Bolts | M10 — 178, M8 — 66 | M10 — 196, M8 — 66 | M10 — 196, M8 — 66 |
| Panel clamps | end 12, middle 54 | end 12, middle 54 | end 12, middle 54 |
| Materials | 105,354 UAH | 109,567 UAH | 108,527 UAH |
| With installation and delivery | 154,238 UAH | 158,354 UAH | 157,314 UAH |
| Per 1 kW | 8,033 UAH/kW | 8,248 UAH/kW | 8,193 UAH/kW |
| Yield | 1,266 kWh/kW · 24,315 kWh/year | 1,139 kWh/kW · 21,865 kWh/year | 1,043 kWh/kW · 20,028 kWh/year |
| Strength σ/fy | 83% | 85% | 91% |
| Deflection / (L/200) | 66% | 59% | 63% |
| Rafter strength | 77% | 89% | 96% |
| Post utilisation | 41% | 47% | 51% |
| Utilisation | 88% | 90% | 89% |
| Depth vs frost depth | ok | ok | ok |
| Bolt utilisation | 34% | 40% | 42% |
| Plate section | 0% | 0% | 0% |
| Not included | engineer to check | engineer to check | engineer to check |
| Checks overall | with a caution | with a caution | with a caution |
Checks and cautions
Member utilisation as the engine computes it. Cautions are checks that pass, but with a small margin.
- Max. frame pitch, mmThe purlins between the frames are used above 80 % (strength or deflection): the structure passes, but the margin is small. A shorter frame pitch or a deeper purlin gives more margin.Kherson: Frame spacing 1 600 mm, 8 frames. Purlin C-channel 41×41×2.5: strength 83%, deflection 66% of L/200 (snow on panel 489 Pa).Cherkasy: Frame spacing 1 400 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 85%, deflection 59% of L/200 (snow on panel 977 Pa).Chernihiv: Frame spacing 1 400 mm, 9 frames. Purlin C-channel 41×41×2.5: strength 91%, deflection 63% of L/200 (snow on panel 1 106 Pa).
- Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Kherson: Foundation Ø450 × 1 500: 0.239 m³ of concrete per post. Wind uplift on the front post ≈ 18.5 kN (with γ=1.5) vs ≈ 21.1 kN (concrete weight + soil friction, estimate) → 88%.Cherkasy: Foundation Ø400 × 1 300: 0.163 m³ of concrete per post. Wind uplift on the front post ≈ 14.2 kN (with γ=1.5) vs ≈ 15.8 kN (concrete weight + soil friction, estimate) → 90%.Chernihiv: Foundation Ø350 × 1 500: 0.144 m³ of concrete per post. Wind uplift on the front post ≈ 13.8 kN (with γ=1.5) vs ≈ 15.5 kN (concrete weight + soil friction, estimate) → 89%.
- Stock length, mmKherson: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 6.12 kN vs 18.00 kN (34%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Cherkasy: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 7.13 kN vs 18.00 kN (40%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.Chernihiv: Rafter 6 535 mm is longer than the 6 000 mm stock length — 2 pieces: Кр1а 1 960, Кр1б 4 575 mm. Splice — plate Н1 L 300 mm of the same profile, back to back, 2+2 bolts M10 cl. 8.8, at 1 960 mm from the lower end of the rafter, where the moment is small. Bolt: 7.62 kN vs 18.00 kN (42%), plate 0%. Rafter splice — engineer to check: the plate's eccentricity, the C-channel's torsion and the axial force are not included.
- Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Cherkasy: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 89%.Chernihiv: Rafter C-channel 100×50×2.5: span between posts 3 790, cantilever 1 372 mm → strength 96%.
Bill of materials
The parts of one table for the median zone (Cherkasy): mark, name, profile, cut length, quantity.
| Mark | Part | Profile | Length, mm | Quantity |
|---|---|---|---|---|
| П1 | Front post | Tube 60×60×2 | 2,757 | 9 |
| П2 | Rear post | Tube 60×60×2 | 4,653 | 9 |
| Кр1а | Rafter (inclined beam) | C-channel 100×50×2.5 | 1,960 | 9 |
| Кр1б | Rafter (inclined beam) | C-channel 100×50×2.5 | 4,575 | 9 |
| Н1 | Rafter splice plate | C-channel 100×50×2.5 | 300 | 9 |
| Пк1 | Frame strut | C-channel 41×41×2.5 | 2,739 | 9 |
| Пк2 | Front frame strut | C-channel 41×41×2.5 | 3,633 | 9 |
| Х1 | Longitudinal brace (cross) | C-channel 41×41×2.5 | 3,027 | 4 |
| Р1 | Purlin (rail) | C-channel 41×41×2.5 | 6,000 | 3 |
| Р2 | Purlin (rail) | C-channel 41×41×2.5 | 6,000 | 3 |
| Р3 | Purlin (rail) | C-channel 41×41×2.5 | 5,660 | 3 |
| Р4 | Purlin (rail) | C-channel 41×41×2.5 | 5,660 | 3 |
| — | Bolt M10×80 / M10×25 set · frame and struts / purlins, braces, connectors | — | — | 33 |
| — | Bolt M10×65 set · brace crossing | — | — | 2 |
| — | Bolt M10×90 set · strut to post — through spacer inserts | — | — | 9 |
| — | Bolt M10×110 set · brace to post — through spacer inserts | — | — | 4 |
| — | Bolt M10×120 set · purlin to rafter | — | — | 54 |
| — | Bolt M10×130 set · post–rafter, strut to post — through spacer inserts | — | — | 45 |
| — | Bolt M10×140 set · strut to rafter — through spacer inserts | — | — | 9 |
| — | Bolt M10×160 set · brace to post — through spacer inserts | — | — | 4 |
| — | Bolt M10×25 set · rafter splice (plate Н1) | — | — | 36 |
| — | End clamp 30 mm | — | — | 12 |
| — | Mid clamp (30–40 mm) | — | — | 54 |
| — | Bolt M8×50 + channel nut | — | — | 66 |
| — | Concrete for 18 posts, Ø400×1300 | — | — | 3.23 m³ |
Profile cutting
54 bars of 6,000 mm, 267.6 m of profile in total.
- Tube 60×60×214 bars
- C-channel 100×50×2.512 bars
- C-channel 41×41×2.528 bars
Estimated cost
The engine's materials estimate for the median zone (Cherkasy).
- Materials
- 109,567₴
- With installation and delivery
- 158,354₴
- Per 1 kW
- 8,248UAH/kW
Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.
All 28 lines of the engine's estimate, with prices
| Item | Quantity | Price, UAH | Sum, UAH |
|---|---|---|---|
| Tube 60×60×2, stock length 6 000 mm | 14 bar | 210 | 17,640 |
| C-channel 100×50×2.5, stock length 6 000 mm | 12 bar | 380 | 27,360 |
| C-channel 41×41×2.5, stock length 6 000 mm | 28 bar | 200 | 33,600 |
| C-channel connector (splice plate L 300) | 6 pcs | 90 | 540 |
| Bolt M10×80 cl. 8.8 set — frame, struts | 9 pcs | 22 | 198 |
| Bolt M10×25 cl. 8.8 set — purlins, braces, connectors | 24 pcs | 22 | 528 |
| Bolt M10×65 cl. 8.8 set — brace crossing | 2 pcs | 27 | 54 |
| Bolt M10×90 cl. 8.8 set — strut to post — through spacer inserts | 9 pcs | 27 | 243 |
| Bolt M10×110 cl. 8.8 set — brace to post — through spacer inserts | 4 pcs | 27 | 108 |
| Bolt M10×120 cl. 8.8 set — purlin to rafter | 74 pcs | 27 | 1,998 |
| Bolt M10×130 cl. 8.8 set — post–rafter, strut to post — through spacer inserts | 45 pcs | 27 | 1,215 |
| Bolt M10×140 cl. 8.8 set — strut to rafter — through spacer inserts | 9 pcs | 27 | 243 |
| Bolt M10×160 cl. 8.8 set — brace to post — through spacer inserts | 4 pcs | 27 | 108 |
| Bolt M10×25 cl. 8.8 set — rafter splice (plate Н1) | 36 pcs | 22 | 792 |
| End clamp 30 mm | 12 pcs | 35 | 420 |
| Mid clamp (30–40 mm) | 54 pcs | 32 | 1,728 |
| Bolt M8×50 A2 + spring channel nut M8 | 73 pcs | 14 | 1,022 |
| Post base anchor pin (M10 / rebar Ø12) | 18 pcs | 20 | 360 |
| Borehole casing (roofing felt / PVC, 300 mm) | 18 pcs | 60 | 1,080 |
| Crushed stone 20–40 for the bottom of the boreholes | 0.23 m³ | 900 | 207 |
| Earth electrode: 2 rods Ø16×1.5 m + strip 40×4 | 1 set | 1,500 | 1,500 |
| Wire PV-3 6 mm² green-yellow | 35 m | 35 | 1,225 |
| Module earthing clip (under the clamp) | 30 pcs | 20 | 600 |
| Cable clip, stainless | 90 pcs | 5 | 450 |
| Zinc paint / cold galvanising spray 400 ml | 3 pcs | 350 | 1,050 |
| Concrete M200 for posts | 3.23 m³ | 3,800 | 12,274 |
| Rebar Ø10 (4 bars per post) | 108 m | 28 | 3,024 |
| Spacer inserts / packs — pieces of the same profile (from offcuts): 4 × 71 mm, 9 × 70 mm, 9 × 50 mm, 4 × 30 mm, 9 × 10 mm | 35 pcs | 0 | 0 |
| Materials | 109,567 | ||
Yield
Yield: 1,139 kWh per 1 kW a year, ≈ 21,865 kWh a year in total (median zone, Cherkasy; tilt 30°, the optimum for the latitude is 35.3°).
A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.