52 Ulica UL-620M-132DDGN (dual glass bifacial) panels (32.24 kW) on 2 tables of 2 × 13. Snow and wind per the DBN for Mykolaiv: S₀ 870 Pa, W₀ 470 Pa.

Power
32.24kW
Steel
1,042.1kg
Posts
40
Bolts
396
Materials
137,458₴
Yield
40,242kWh/year

Ground frame designer

Design the 30 kW plant in the builder

Opens the 2 × 13 table with the Ulica UL-620M-132DDGN (dual glass bifacial) panel and the loads for Mykolaiv.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Panel

Ulica UL-620M-132DDGN (dual glass bifacial): 620 W, 2,382 × 1,134 mm, portrait.

One table's structure (tables: 2)

Layout2 tables, each 2 × 13 = 26 panels
Loads (DBN V.1.2-2:2006)snow S₀ 870 Pa, wind W₀ 470 Pa, frost depth 0.6 m
PostsTube 60×60×2
RaftersC-channel 60×40×2
Purlins and bracesC-channel 60×40×2
Frames10 frames, pitch up to 1,630 mm
Posts20
Footings (bored concrete)20 pcs, Ø400 mm, depth 900 mm
Concrete2.49 m³
Tilt30°
Panel bottom / post top600 / 2,287 mm
Panel field size15,122 × 3,102 mm
Row spacing between tables (no shade on 21 December)10,880 mm at noon · 12,270 mm ±2 h
Steel521.0 kg
BoltsM10 — 142, M8 — 56
Panel clampsend 8, middle 48
Materials68,729 UAH
With installation and delivery109,914 UAH
Per 1 kW6,818 UAH/kW
Yield1,248 kWh/kW · 20,121 kWh/year

Checks and cautions

CheckValueStatus
Strength σ/fy46%passes
Deflection / (L/200)30%passes
Rafter strength81%with a caution
Post utilisation16%passes
Utilisation97%with a caution
Depth vs frost depthokpasses
  • Rafter profileThe rafter is used above 80 %, or the frame's posts stand far apart: the structure passes, but the margin is small.Rafter C-channel 60×40×2: span between posts 2 276, cantilever 824 mm → strength 81%.
  • Embedment, mmThe footing resists wind uplift at above 80 % utilisation, or it is shallower than the frost depth. The soil resistance in the calculation is an estimate — check the soil on site.Foundation Ø400 × 900: 0.113 m³ of concrete per post. Wind uplift on the front post ≈ 10.6 kN (with γ=1.5) vs ≈ 10.9 kN (concrete weight + soil friction, estimate) → 97%.

Bill of materials

The bill of materials and the estimate are per table; tables: 2.

MarkPartProfileLength, mmQuantity
П1Front postTube 60×60×22,07410
П2Rear postTube 60×60×23,21210
Кр1Rafter (inclined beam)C-channel 60×40×23,92410
Пк1Frame strutC-channel 60×40×21,81810
Х1Longitudinal brace (cross)C-channel 60×40×22,3254
Р1Purlin (rail)C-channel 60×40×26,0002
Р2Purlin (rail)C-channel 60×40×26,0002
Р3Purlin (rail)C-channel 60×40×26,0002
Р4Purlin (rail)C-channel 60×40×26,0002
Р5Purlin (rail)C-channel 60×40×23,1222
Р6Purlin (rail)C-channel 60×40×23,1222
—Bolt M10×25 set · purlins, braces, connectors——34
—Bolt M10×80 set · purlin to rafter——40
—Bolt M10×90 set · strut to post — through spacer inserts——10
—Bolt M10×130 set · post–rafter — through spacer inserts——40
—Bolt M10×140 set · strut to rafter — through spacer inserts——10
—Bolt M10×150 set · brace to post — through spacer inserts——8
—End clamp 30 mm——8
—Mid clamp (30–40 mm)——48
—Bolt M8×50 + channel nut——56
—Concrete for 20 posts, Ø400×900——2.49 m³

Profile cutting

32 bars of 6,000 mm, 180.1 m of profile in total.

  • Tube 60×60×210 bars
  • C-channel 60×40×222 bars

Estimated cost

The bill of materials and the estimate are per table; tables: 2.

Materials per table
68,729₴
With installation and delivery
109,914₴
Per 1 kW
6,818UAH/kW

The engine's estimate has 23 lines; the full list is in the builder. Prices are the typical market prices built into the Solispec engine, as of 06.10.2026; no margin, no VAT.

Materials for all tables (2): 137,458 UAH.

Yield

Yield: 1,248 kWh per 1 kW a year, ≈ 40,242 kWh a year in total for Mykolaiv (tilt 30°, the optimum for the latitude is 34.4°).

A preliminary calculation; a design needs an engineer's check. Snow and wind per DBN V.1.2-2:2006 for the regional centre; profiles, footings and estimate by the Solispec engine 0.12.0.