Solar plant: site data

Solar power plant in Ulianivka, Zhytomyrskyi Raion, Zhytomyr Oblast

Ulianivka: 1,089 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 1.4% below the oblast median (1,104). #672 of 686 in the rayon, #1440 of 1700 in the oblast.

Zhytomyr, the rayon centre, is 63 km away. 226 m above sea level. 23 km away: Polonne, the nearest bigger centre, 1,103 — 1.2% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 62 km. 12.29 m between rows, pitch 16.11 m (latitude 50.2°).

Yield of 1 kWp
1,089kWh/year
Tilt
37°2° east of south
10 kW
10,889kWh/year
Row pitch
16.11m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Ulianivka

The designer opens with this place’s coordinates, latitude 50.2° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 62 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb89Mar116Apr131May137Jun138Jul135Aug110Sep81Oct36Nov28Dec

July: 138 kWh/kWp, December: 28 — 4.9 times less.

February: 53 against 56 in the oblast, 5.4% less.

Ulianivka: plants, kWh
kWpA yearJulyDecember
55,445690140
1010,8891,380280
1516,3342,070420

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zhytomyrskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.