Solar plant: site data

Solar power plant in Lisove, Zviahelskyi Raion, Zhytomyr Oblast

Lisove: 1,084 kWh per kWp a year, tilt 37° 3° east of south (PVGIS). 1.9% below the oblast median (1,104). #259 of 294 in the rayon, #1507 of 1700 in the oblast.

Zvyahel, the rayon centre, is 38 km away. 222 m above sea level. 28 km away: Polonne, the nearest bigger centre, 1,103 — 1.7% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 60 km. 12.35 m between rows, pitch 16.17 m (latitude 50.3°).

Yield of 1 kWp
1,084kWh/year
Tilt
37°3° east of south
10 kW
10,838kWh/year
Row pitch
16.17m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Lisove

The designer opens with this place’s coordinates, latitude 50.3° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 60 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan54Feb89Mar115Apr129May136Jun137Jul134Aug109Sep80Oct35Nov29Dec

July: 137 kWh/kWp, December: 29 — 4.7 times less.

December: 29 against 27 in the oblast, 7.4% more.

Lisove: plants, kWh
kWpA yearJulyDecember
55,419685145
1010,8381,370290
1516,2572,055435

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.