Solar plant: site data

Solar power plant in Sarnivka, Korostenskyi Raion, Zhytomyr Oblast

Sarnivka: 1,073 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 2.8% below the oblast median (1,104). #465 of 560 in the rayon, #1593 of 1700 in the oblast.

Korosten, the rayon centre, is 84 km away. 185 m above sea level. 59 km away: Zvyahel, the nearest bigger centre, 1,101 — 2.5% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 101 km. 13.52 m between rows, pitch 17.29 m (latitude 51.1°).

Yield of 1 kWp
1,073kWh/year
Tilt
38°4° east of south
10 kW
10,733kWh/year
Row pitch
17.29m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Sarnivka

The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 101 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan56Feb88Mar116Apr129May136Jun135Jul133Aug108Sep77Oct34Nov26Dec

June: 136 kWh/kWp, December: 26 — 5.2 times less.

October: 77 against 81 in the oblast, 4.9% less.

Sarnivka: plants, kWh
kWpA yearJuneDecember
55,367680130
1010,7331,360260
1516,1002,040390

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Korostenskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.