Solar plant: site data
Solar power plant in Kovalivka, Korostenskyi Raion, Zhytomyr Oblast
Kovalivka: 1,066 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 3.4% below the oblast median (1,104). #494 of 560 in the rayon, #1630 of 1700 in the oblast.
Korosten, the rayon centre, is 78 km away. 183 m above sea level. 57 km away: Zvyahel, the nearest bigger centre, 1,101 — 3.2% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 105 km. 13.51 m between rows, pitch 17.28 m (latitude 51.1°).
- Yield of 1 kWp
- 1,066kWh/year
- Tilt
- 38°4° east of south
- 10 kW
- 10,663kWh/year
- Row pitch
- 17.28m · GCR 0.28
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,320 / 520Pa
Ground frame designer
A ground frame for a solar plant: Kovalivka
The designer opens with this place’s coordinates, latitude 51.1° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 105 km: snow 1,320 Pa, wind 520 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 135 kWh/kWp, December: 27 — 5.0 times less.
October: 76 against 81 in the oblast, 6.2% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,332 | 675 | 135 |
| 10 | 10,663 | 1,350 | 270 |
| 15 | 15,995 | 2,025 | 405 |
Example: a 10 kW ground frame
For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.
How these numbers are computed
Nearby
- Poloskantsa2 km1,066 kWh/kWp
- Zolnia3 km1,066 kWh/kWp
- Serdiuky3 km1,068 kWh/kWp
- Luhove4 km1,067 kWh/kWp
- Lopatychi5 km1,076 kWh/kWp
- Sarnivka6 km1,073 kWh/kWp
All places: Korostenskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.