Solar plant: site data

Solar power plant in Prykhid, Zviahelskyi Raion, Zhytomyr Oblast

Prykhid: 1,065 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 3.6% below the oblast median (1,104). #291 of 294 in the rayon, #1643 of 1700 in the oblast.

Zvyahel, the rayon centre, is 45 km away. 198 m above sea level. 45 km away: Zvyahel, the nearest bigger centre, 1,101 — 3.3% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 87 km. 13.36 m between rows, pitch 17.13 m (latitude 51.0°).

Yield of 1 kWp
1,065kWh/year
Tilt
38°4° east of south
10 kW
10,645kWh/year
Row pitch
17.13m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Prykhid

The designer opens with this place’s coordinates, latitude 51.0° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 87 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan54Feb88Mar114Apr128May134Jun134Jul133Aug107Sep77Oct34Nov27Dec

June: 134 kWh/kWp, December: 27 — 5.0 times less.

June: 134 against 141 in the oblast, 5.0% less.

Prykhid: plants, kWh
kWpA yearJuneDecember
55,323670135
1010,6451,340270
1515,9682,010405

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.