Solar plant: site data

Solar power plant in Bronytsia, Zviahelskyi Raion, Zhytomyr Oblast

Bronytsia: 1,064 kWh per kWp a year, tilt 38° 4° east of south (PVGIS). 3.7% below the oblast median (1,104). #292 of 294 in the rayon, #1646 of 1700 in the oblast.

Zvyahel, the rayon centre, is 43 km away. 206 m above sea level. 43 km away: Zvyahel, the nearest bigger centre, 1,101 — 3.4% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 85 km. 13.33 m between rows, pitch 17.10 m (latitude 50.9°).

Yield of 1 kWp
1,064kWh/year
Tilt
38°4° east of south
10 kW
10,640kWh/year
Row pitch
17.10m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Bronytsia

The designer opens with this place’s coordinates, latitude 50.9° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 85 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb88Mar114Apr128May134Jun134Jul133Aug107Sep78Oct34Nov28Dec

June: 134 kWh/kWp, December: 28 — 4.8 times less.

February: 53 against 56 in the oblast, 5.4% less.

Bronytsia: plants, kWh
kWpA yearJuneDecember
55,320670140
1010,6401,340280
1515,9602,010420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zviahelskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.