Krasnopil: 1,105 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). Exactly the oblast median (1,104). #150 of 160 in the rayon, #796 of 1700 in the oblast.

Berdychiv, the rayon centre, is 39 km away. 272 m above sea level. 31 km away: Khmilnyk, the nearest bigger centre, 1,116 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 63 km. 11.65 m between rows, pitch 15.52 m (latitude 49.8°).

Yield of 1 kWp
1,105kWh/year
Tilt
36°2° east of south
10 kW
11,053kWh/year
Row pitch
15.52m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,460 / 460Pa

Ground frame designer

A ground frame for a solar plant: Krasnopil

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 63 km: snow 1,460 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

30Jan51Feb89Mar119Apr135May140Jun142Jul138Aug112Sep84Oct37Nov29Dec

July: 142 kWh/kWp, December: 29 — 4.9 times less.

January: 30 against 34 in the oblast, 11.8% less.

Krasnopil: plants, kWh
kWpA yearJulyDecember
55,527710145
1011,0531,420290
1516,5802,130435

Snow and wind: Житомир

Example: a 10 kW ground frame

For the loads of Zhytomyr: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.