Solar plant: site data
Solar power plant in Lykhosilka, Berdychivskyi Raion, Zhytomyr Oblast
Lykhosilka: 1,106 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,104). #149 of 160 in the rayon, #769 of 1700 in the oblast.
Berdychiv, the rayon centre, is 40 km away. 257 m above sea level. 34 km away: Khmilnyk, the nearest bigger centre, 1,116 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Житомир, 62 km. 11.96 m between rows, pitch 15.78 m (latitude 49.9°).
- Yield of 1 kWp
- 1,106kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,058kWh/year
- Row pitch
- 15.78m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,460 / 460Pa
Ground frame designer
A ground frame for a solar plant: Lykhosilka
The designer opens with this place’s coordinates, latitude 49.9° for the row spacing and the DBN loads of the nearest regional centre — Житомир, 62 km: snow 1,460 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 142 kWh/kWp, December: 28 — 5.1 times less.
January: 31 against 34 in the oblast, 8.8% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,529 | 710 | 140 |
| 10 | 11,058 | 1,420 | 280 |
| 15 | 16,587 | 2,130 | 420 |
Example: a 10 kW ground frame
For the loads of Zhytomyr: 11.16 kWp, 18 panels, 350 kg of steel, 12 piles, materials ≈ 52,606 UAH.
How these numbers are computed
Nearby
- Burkivtsi2 km1,106 kWh/kWp
- Molochky3 km1,100 kWh/kWp
- Krasnopil4 km1,105 kWh/kWp
- Pevna6 km1,107 kWh/kWp
- Motrunky6 km1,105 kWh/kWp
- Yasopil6 km1,107 kWh/kWp
All places: Berdychivskyi RaionZhytomyr Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.