Solar plant: site data

Solar power plant in Troiany, Berdianskyi Raion, Zaporizhzhia Oblast

Troiany: 1,275 kWh per kWp a year, tilt 36° 3° west of south (PVGIS). 5.2% above the oblast median (1,212). #20 of 116 in the rayon, #37 of 972 in the oblast.

Berdyansk, the rayon centre, is 19 km away. 37 m above sea level. 19 km away: Berdyansk, the nearest bigger centre, 1,294 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 155 km. 9.48 m between rows, pitch 13.35 m (latitude 46.9°).

Yield of 1 kWp
1,275kWh/year
Tilt
36°3° west of south
10 kW
12,754kWh/year
Row pitch
13.35m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Troiany

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 155 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan63Feb104Mar129Apr150May150Jun157Jul160Aug132Sep100Oct56Nov35Dec

August: 160 kWh/kWp, December: 35 — 4.6 times less.

February: 63 against 57 in the oblast, 10.5% more.

Troiany: plants, kWh
kWpA yearAugustDecember
56,377800175
1012,7541,600350
1519,1312,400525

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed