Solar plant: site data
Solar power plant in Andrivka, Berdianskyi Raion, Zaporizhzhia Oblast
Andrivka: 1,254 kWh per kWp a year, tilt 36° 2° west of south (PVGIS). 3.4% above the oblast median (1,212). #32 of 116 in the rayon, #83 of 972 in the oblast.
Berdyansk, the rayon centre, is 21 km away. 33 m above sea level. 21 km away: Berdyansk, the nearest bigger centre, 1,294 — 3.2% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 153 km. 9.49 m between rows, pitch 13.36 m (latitude 46.9°).
- Yield of 1 kWp
- 1,254kWh/year
- Tilt
- 36°2° west of south
- 10 kW
- 12,535kWh/year
- Row pitch
- 13.36m · GCR 0.36
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,110 / 460Pa
Ground frame designer
A ground frame for a solar plant: Andrivka
The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 153 km: snow 1,110 Pa, wind 460 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 157 kWh/kWp, December: 34 — 4.6 times less.
February: 62 against 57 in the oblast, 8.8% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 6,268 | 785 | 170 |
| 10 | 12,535 | 1,570 | 340 |
| 15 | 18,803 | 2,355 | 510 |
Example: a 10 kW ground frame
For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Troiany2 km1,275 kWh/kWp
- Polouzivka5 km1,255 kWh/kWp
- Roza6 km1,283 kWh/kWp
- Dmytrivka7 km1,285 kWh/kWp
- Novotroitske8 km1,241 kWh/kWp
- Shovkove8 km1,291 kWh/kWp
All places: Berdianskyi RaionZaporizhzhia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.