Solar plant: site data

Solar power plant in Nadiia, Zaporizkyi Raion, Zaporizhzhia Oblast

Nadiia: 1,193 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.6% below the oblast median (1,212). #156 of 286 in the rayon, #710 of 972 in the oblast.

Zaporizhzhya, the rayon centre, is 24 km away. 130 m above sea level. 20 km away: Solone, the nearest bigger centre, 1,184 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 26 km. 10.23 m between rows, pitch 14.10 m (latitude 48.0°).

Yield of 1 kWp
1,193kWh/year
Tilt
36°2° east of south
10 kW
11,930kWh/year
Row pitch
14.10m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Nadiia

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 26 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan55Feb97Mar119Apr142May145Jun152Jul152Aug124Sep93Oct50Nov29Dec

July: 152 kWh/kWp, December: 29 — 5.2 times less.

December: 29 against 32 in the oblast, 9.4% less.

Nadiia: plants, kWh
kWpA yearJulyDecember
55,965760145
1011,9301,520290
1517,8952,280435

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zaporizkyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.