Solar plant: site data

Solar power plant in Petropil, Zaporizkyi Raion, Zaporizhzhia Oblast

Petropil: 1,196 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.3% below the oblast median (1,212). #115 of 286 in the rayon, #652 of 972 in the oblast.

Zaporizhzhya, the rayon centre, is 22 km away. 117 m above sea level. 22 km away: Zaporizhzhya, the nearest bigger centre, 1,227 — 2.5% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 24 km. 10.22 m between rows, pitch 14.09 m (latitude 48.0°).

Yield of 1 kWp
1,196kWh/year
Tilt
36°2° east of south
10 kW
11,963kWh/year
Row pitch
14.09m · GCR 0.34
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Petropil

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 24 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan57Feb97Mar119Apr142May145Jun152Jul152Aug124Sep92Oct50Nov30Dec

July: 152 kWh/kWp, December: 30 — 5.1 times less.

November: 50 against 54 in the oblast, 7.4% less.

Petropil: plants, kWh
kWpA yearJulyDecember
55,982760150
1011,9631,520300
1517,9452,280450

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 382 kg of steel, 14 piles, materials ≈ 50,687 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Zaporizkyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.