Solar plant: site data

Solar power plant in Hromivka, Melitopolskyi Raion, Zaporizhzhia Oblast

Hromivka: 1,236 kWh per kWp a year, tilt 36° facing south (PVGIS). 2.0% above the oblast median (1,212). #96 of 215 in the rayon, #158 of 972 in the oblast.

Melitopol, the rayon centre, is 51 km away. 65 m above sea level. 37 km away: Pryazovske, the nearest bigger centre, 1,254 — 1.4% less here. Snow and wind from the nearest regional centre in the DBN — Запоріжжя, 123 km. 9.51 m between rows, pitch 13.38 m (latitude 46.9°).

Yield of 1 kWp
1,236kWh/year
Tilt
36°facing south
10 kW
12,361kWh/year
Row pitch
13.38m · GCR 0.36
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,110 / 460Pa

Ground frame designer

A ground frame for a solar plant: Hromivka

The designer opens with this place’s coordinates, latitude 46.9° for the row spacing and the DBN loads of the nearest regional centre — Запоріжжя, 123 km: snow 1,110 Pa, wind 460 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan60Feb102Mar123Apr143May143Jun152Jul154Aug128Sep98Oct57Nov35Dec

August: 154 kWh/kWp, December: 35 — 4.4 times less.

January: 41 against 37 in the oblast, 10.8% more.

Hromivka: plants, kWh
kWpA yearAugustDecember
56,181770175
1012,3611,540350
1518,5422,310525

Snow and wind: Запоріжжя

Example: a 10 kW ground frame

For the loads of Zaporizhzhia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Melitopolskyi RaionZaporizhzhia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.