Solar plant: site data

Solar power plant in Tiachivka, Tiachivskyi Raion, Zakarpattia Oblast

Tiachivka: 1,159 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 1.6% above the oblast median (1,141). #5 of 66 in the rayon, #204 of 613 in the oblast.

Tyachiv, the rayon centre, is 3 km away. 230 m above sea level. 3 km away: Tyachiv, the nearest bigger centre, the same 1,158. Snow and wind from the nearest regional centre in the DBN — Ужгород, 115 km. 10.72 m between rows, pitch 14.49 m (latitude 48.0°).

Yield of 1 kWp
1,159kWh/year
Tilt
38°2° east of south
10 kW
11,591kWh/year
Row pitch
14.49m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Tiachivka

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 115 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan63Feb99Mar118Apr128May131Jun139Jul140Aug113Sep92Oct58Nov34Dec

August: 140 kWh/kWp, December: 34 — 4.1 times less.

January: 45 against 39 in the oblast, 15.4% more.

Tiachivka: plants, kWh
kWpA yearAugustDecember
55,796700170
1011,5911,400340
1517,3872,100510

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Tiachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.