Solar plant: site data
Solar power plant in Sitnyi, Rakhivskyi Raion, Zakarpattia Oblast
Sitnyi: 1,040 kWh per kWp a year, tilt 34° 8° east of south (PVGIS). 8.9% below the oblast median (1,141). #24 of 36 in the rayon, #539 of 613 in the oblast.
Rakhiv, the rayon centre, is 10 km away. 768 m above sea level — above 500 m the DBN snow and wind are higher. 10 km away: Rakhiv, the nearest bigger centre, 1,068 — 2.7% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 94 km. 9.79 m between rows, pitch 13.76 m (latitude 48.1°).
- Yield of 1 kWp
- 1,040kWh/year
- Tilt
- 34°8° east of south
- 10 kW
- 10,396kWh/year
- Row pitch
- 13.76m · GCR 0.35
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Sitnyi
The designer opens with this place’s coordinates, latitude 48.1° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 94 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 134 kWh/kWp, December: 12 — 11.2 times less.
December: 12 against 31 in the oblast, 61.3% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,198 | 670 | 60 |
| 10 | 10,396 | 1,340 | 120 |
| 15 | 15,594 | 2,010 | 180 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Bilyn3 km1,048 kWh/kWp
- Kvasy4 km1,059 kWh/kWp
- Trostianets6 km1,074 kWh/kWp
- Kleva6 km1,020 kWh/kWp
- Roztoky6 km1,062 kWh/kWp
- Vydrychka8 km953 kWh/kWp
All places: Rakhivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.