Solar plant: site data
Solar power plant in Potochok, Khustskyi Raion, Zakarpattia Oblast
Potochok: 1,108 kWh per kWp a year, tilt 37° 16° east of south (PVGIS). 2.9% below the oblast median (1,141). #83 of 145 in the rayon, #417 of 613 in the oblast.
Khust, the rayon centre, is 17 km away. 264 m above sea level. 17 km away: Khust, the nearest bigger centre, 978 — 13.3% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 90 km. 10.68 m between rows, pitch 14.50 m (latitude 48.3°).
- Yield of 1 kWp
- 1,108kWh/year
- Tilt
- 37°16° east of south
- 10 kW
- 11,081kWh/year
- Row pitch
- 14.50m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,340 / 370Pa
Ground frame designer
A ground frame for a solar plant: Potochok
The designer opens with this place’s coordinates, latitude 48.3° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 90 km: snow 1,340 Pa, wind 370 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 139 kWh/kWp, December: 30 — 4.6 times less.
February: 55 against 60 in the oblast, 8.3% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,541 | 695 | 150 |
| 10 | 11,081 | 1,390 | 300 |
| 15 | 16,622 | 2,085 | 450 |
Example: a 10 kW ground frame
For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.
How these numbers are computed
Nearby
- Monastyrets1 km1,135 kWh/kWp
- Oblaz1 km1,129 kWh/kWp
- Topolyn2 km1,110 kWh/kWp
- Krainie2 km1,139 kWh/kWp
- Ozhoverkh3 km1,111 kWh/kWp
- Horinchovo4 km1,138 kWh/kWp
All places: Khustskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.