Solar plant: site data
Solar power plant in Nyzhnii Dubovets, Tiachivskyi Raion, Zakarpattia Oblast
Nyzhnii Dubovets: 1,134 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 0.6% below the oblast median (1,141). #42 of 66 in the rayon, #345 of 613 in the oblast.
Tyachiv, the rayon centre, is 29 km away. 393 m above sea level. 25 km away: Rakhiv, the nearest bigger centre, 1,068 — 6.2% more here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 104 km. 10.57 m between rows, pitch 14.39 m (latitude 48.2°).
- Yield of 1 kWp
- 1,134kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,338kWh/year
- Row pitch
- 14.39m · GCR 0.33
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Nyzhnii Dubovets
The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 104 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 138 kWh/kWp, December: 32 — 4.3 times less.
January: 45 against 39 in the oblast, 15.4% more.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,669 | 690 | 160 |
| 10 | 11,338 | 1,380 | 320 |
| 15 | 17,007 | 2,070 | 480 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Dubove2 km1,134 kWh/kWp
- Vyshnii Dubovets2 km1,135 kWh/kWp
- Kalyny3 km1,125 kWh/kWp
- Zareku3 km1,131 kWh/kWp
- Solone4 km1,129 kWh/kWp
- Hanychi7 km1,142 kWh/kWp
All places: Tiachivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.