Solar plant: site data

Solar power plant in Mizhhirya, Khustskyi Raion, Zakarpattia Oblast

Mizhhirya: 1,034 kWh per kWp a year, tilt 36° 12° east of south (PVGIS). 9.4% below the oblast median (1,141). #115 of 145 in the rayon, #559 of 613 in the oblast.

Khust, the rayon centre, is 42 km away. 450 m above sea level. 42 km away: Khust, the nearest bigger centre, 978 — 5.7% more here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 89 km. 10.59 m between rows, pitch 14.46 m (latitude 48.5°).

Yield of 1 kWp
1,034kWh/year
Tilt
36°12° east of south
10 kW
10,342kWh/year
Row pitch
14.46m · GCR 0.33
T_min
-38 °Cregion IIIA, Carpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Mizhhirya

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 89 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

38Jan56Feb88Mar105Apr116May121Jun128Jul131Aug102Sep77Oct44Nov28Dec

August: 131 kWh/kWp, December: 28 — 4.7 times less.

November: 44 against 53 in the oblast, 17.0% less.

Mizhhirya: plants, kWh
kWpA yearAugustDecember
55,171655140
1010,3421,310280
1515,5131,965420

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Khustskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.