Solar power plant in Lisarnia, Mukachivskyi Raion, Zakarpattia Oblast

Lisarnia: 1,104 kWh per kWp a year, tilt 37° 5° east of south (PVGIS). 3.3% below the oblast median (1,141). #100 of 139 in the rayon, #432 of 613 in the oblast.

Mukachevo, the rayon centre, is 14 km away. 345 m above sea level. 14 km away: Mukachevo, the nearest bigger centre, 1,165 — 5.3% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 32 km. 10.87 m between rows, pitch 14.69 m (latitude 48.6°).

Yield of 1 kWp
1,104kWh/year
Tilt
37°5° east of south
10 kW
11,037kWh/year
Row pitch
14.69m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Lisarnia

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 32 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan60Feb96Mar113Apr125May130Jun135Jul134Aug109Sep84Oct50Nov30Dec

July: 135 kWh/kWp, December: 30 — 4.5 times less.

November: 50 against 53 in the oblast, 5.7% less.

Lisarnia: plants, kWh
kWpA yearJulyDecember
55,519675150
1011,0371,350300
1516,5562,025450

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.