Solar plant: site data

Solar power plant in Kryte, Mukachivskyi Raion, Zakarpattia Oblast

Kryte: 1,111 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). 2.7% below the oblast median (1,141). #88 of 139 in the rayon, #407 of 613 in the oblast.

Mukachevo, the rayon centre, is 18 km away. 442 m above sea level. 18 km away: Mukachevo, the nearest bigger centre, 1,165 — 4.7% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 29 km. 10.90 m between rows, pitch 14.72 m (latitude 48.6°).

Yield of 1 kWp
1,111kWh/year
Tilt
37°2° east of south
10 kW
11,105kWh/year
Row pitch
14.72m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Kryte

The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 29 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

43Jan60Feb97Mar114Apr125May130Jun135Jul134Aug109Sep84Oct50Nov29Dec

July: 135 kWh/kWp, December: 29 — 4.7 times less.

January: 43 against 39 in the oblast, 10.3% more.

Kryte: plants, kWh
kWpA yearJulyDecember
55,553675145
1011,1051,350290
1516,6582,025435

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.