Solar plant: site data
Solar power plant in Fontyniasy, Tiachivskyi Raion, Zakarpattia Oblast
Fontyniasy: 1,103 kWh per kWp a year, tilt 36° 10° east of south (PVGIS). 3.3% below the oblast median (1,141). #56 of 66 in the rayon, #434 of 613 in the oblast.
Tyachiv, the rayon centre, is 29 km away. 426 m above sea level. 29 km away: Tyachiv, the nearest bigger centre, 1,158 — 4.7% less here. Snow and wind from the nearest regional centre in the DBN — Івано-Франківськ, 104 km. 10.38 m between rows, pitch 14.25 m (latitude 48.2°).
- Yield of 1 kWp
- 1,103kWh/year
- Tilt
- 36°10° east of south
- 10 kW
- 11,033kWh/year
- Row pitch
- 14.25m · GCR 0.34
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,410 / 500Pa
Ground frame designer
A ground frame for a solar plant: Fontyniasy
The designer opens with this place’s coordinates, latitude 48.2° for the row spacing and the DBN loads of the nearest regional centre — Івано-Франківськ, 104 km: snow 1,410 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
August: 138 kWh/kWp, December: 29 — 4.8 times less.
November: 48 against 53 in the oblast, 9.4% less.
| kWp | A year | August | December |
|---|---|---|---|
| 5 | 5,517 | 690 | 145 |
| 10 | 11,033 | 1,380 | 290 |
| 15 | 16,550 | 2,070 | 435 |
Snow and wind: Івано-Франківськ
Example: a 10 kW ground frame
For the loads of Ivano-Frankivsk: 11.16 kWp, 18 panels, 410 kg of steel, 16 piles, materials ≈ 54,212 UAH.
How these numbers are computed
Nearby
- Shyrokyi Luh3 km1,123 kWh/kWp
- Pryhid3 km1,097 kWh/kWp
- Tarasivka5 km1,134 kWh/kWp
- Tysalovo6 km1,088 kWh/kWp
- Novoselytsia8 km1,075 kWh/kWp
- Velyka Uholka9 km1,034 kWh/kWp
All places: Tiachivskyi RaionZakarpattia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.