Solar plant: site data

Solar power plant in Chernyk, Mukachivskyi Raion, Zakarpattia Oblast

Chernyk: 1,101 kWh per kWp a year, tilt 37° 8° east of south (PVGIS). 3.5% below the oblast median (1,141). #101 of 139 in the rayon, #437 of 613 in the oblast.

Mukachevo, the rayon centre, is 24 km away. 273 m above sea level. 24 km away: Mukachevo, the nearest bigger centre, 1,165 — 5.5% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 53 km. 10.84 m between rows, pitch 14.66 m (latitude 48.5°).

Yield of 1 kWp
1,101kWh/year
Tilt
37°8° east of south
10 kW
11,014kWh/year
Row pitch
14.66m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Chernyk

The designer opens with this place’s coordinates, latitude 48.5° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 53 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

41Jan59Feb96Mar112Apr124May129Jun135Jul135Aug108Sep84Oct50Nov29Dec

July: 135 kWh/kWp, December: 29 — 4.7 times less.

December: 29 against 31 in the oblast, 6.5% less.

Chernyk: plants, kWh
kWpA yearJulyDecember
55,507675145
1011,0141,350290
1516,5212,025435

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mukachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.