Solar plant: site data

Solar power plant in Bushtyno, Tiachivskyi Raion, Zakarpattia Oblast

Bushtyno: 1,147 kWh per kWp a year, tilt 38° 2° east of south (PVGIS). 0.6% above the oblast median (1,141). #16 of 66 in the rayon, #258 of 613 in the oblast.

Tyachiv, the rayon centre, is 8 km away. 200 m above sea level. 8 km away: Tyachiv, the nearest bigger centre, 1,158 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Ужгород, 109 km. 10.73 m between rows, pitch 14.50 m (latitude 48.0°).

Yield of 1 kWp
1,147kWh/year
Tilt
38°2° east of south
10 kW
11,474kWh/year
Row pitch
14.50m · GCR 0.33
T_min
-32 °Cregion IIIB, Transcarpathian
Snow S₀ / wind W₀
1,340 / 370Pa

Ground frame designer

A ground frame for a solar plant: Bushtyno

The designer opens with this place’s coordinates, latitude 48.0° for the row spacing and the DBN loads of the nearest regional centre — Ужгород, 109 km: snow 1,340 Pa, wind 370 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

45Jan63Feb98Mar117Apr127May130Jun138Jul138Aug112Sep90Oct57Nov33Dec

July: 138 kWh/kWp, December: 33 — 4.2 times less.

January: 45 against 39 in the oblast, 15.4% more.

Bushtyno: plants, kWh
kWpA yearJulyDecember
55,737690165
1011,4741,380330
1517,2112,070495

Snow and wind: Ужгород

Example: a 10 kW ground frame

For the loads of Uzhhorod: 11.16 kWp, 18 panels, 366 kg of steel, 12 piles, materials ≈ 48,597 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Tiachivskyi RaionZakarpattia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.