Solar plant: site data

Solar power plant in Topylyshche, Volodymyrskyi Raion, Volyn Oblast

Topylyshche: 1,093 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.8% above the oblast median (1,084). #109 of 215 in the rayon, #278 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 33 km away. 221 m above sea level. 33 km away: Volodymyr-Volynskyi, the nearest bigger centre, 1,100 — 0.6% less here. Snow and wind from the nearest regional centre in the DBN — Луцьк, 54 km. 12.98 m between rows, pitch 16.75 m (latitude 50.6°).

Yield of 1 kWp
1,093kWh/year
Tilt
38°1° east of south
10 kW
10,933kWh/year
Row pitch
16.75m · GCR 0.29
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Topylyshche

The designer opens with this place’s coordinates, latitude 50.6° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 54 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan51Feb90Mar119Apr131May136Jun136Jul135Aug109Sep83Oct40Nov29Dec

June: 136 kWh/kWp, December: 29 — 4.7 times less.

November: 40 against 37 in the oblast, 8.1% more.

Topylyshche: plants, kWh
kWpA yearJuneDecember
55,467680145
1010,9331,360290
1516,4002,040435

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 387 kg of steel, 14 piles, materials ≈ 51,425 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.