Solar power plant in Staryi Zahoriv, Volodymyrskyi Raion, Volyn Oblast

Staryi Zahoriv: 1,096 kWh per kWp a year, tilt 38° facing south (PVGIS). 1.1% above the oblast median (1,084). #76 of 215 in the rayon, #159 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 31 km away. 223 m above sea level. 31 km away: Volodymyr-Volynskyi, the nearest bigger centre, the same 1,100. Snow and wind from the nearest regional centre in the DBN — Луцьк, 50 km. 13.03 m between rows, pitch 16.80 m (latitude 50.7°).

Yield of 1 kWp
1,096kWh/year
Tilt
38°facing south
10 kW
10,958kWh/year
Row pitch
16.80m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Staryi Zahoriv

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 50 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan52Feb93Mar119Apr132May136Jun136Jul135Aug109Sep83Oct40Nov28Dec

June: 136 kWh/kWp, December: 28 — 4.9 times less.

November: 40 against 37 in the oblast, 8.1% more.

Staryi Zahoriv: plants, kWh
kWpA yearJuneDecember
55,479680140
1010,9581,360280
1516,4372,040420

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 376 kg of steel, 12 piles, materials ≈ 50,491 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.