Solar plant: site data

Solar power plant in Novyi Zahoriv, Volodymyrskyi Raion, Volyn Oblast

Novyi Zahoriv: 1,095 kWh per kWp a year, tilt 38° facing south (PVGIS). 0.9% above the oblast median (1,084). #94 of 215 in the rayon, #225 of 1120 in the oblast.

Volodymyr-Volynskyi, the rayon centre, is 29 km away. 216 m above sea level. 29 km away: Volodymyr-Volynskyi, the nearest bigger centre, the same 1,100. Snow and wind from the nearest regional centre in the DBN — Луцьк, 52 km. 13.03 m between rows, pitch 16.80 m (latitude 50.7°).

Yield of 1 kWp
1,095kWh/year
Tilt
38°facing south
10 kW
10,945kWh/year
Row pitch
16.80m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,240 / 480Pa

Ground frame designer

A ground frame for a solar plant: Novyi Zahoriv

The designer opens with this place’s coordinates, latitude 50.7° for the row spacing and the DBN loads of the nearest regional centre — Луцьк, 52 km: snow 1,240 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan51Feb93Mar119Apr132May137Jun136Jul135Aug109Sep83Oct40Nov27Dec

June: 137 kWh/kWp, December: 27 — 5.1 times less.

November: 40 against 37 in the oblast, 8.1% more.

Novyi Zahoriv: plants, kWh
kWpA yearJuneDecember
55,473685135
1010,9451,370270
1516,4182,055405

Snow and wind: Луцьк

Example: a 10 kW ground frame

For the loads of Lutsk: 11.16 kWp, 18 panels, 387 kg of steel, 14 piles, materials ≈ 51,425 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Volodymyrskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.