Solar power plant in Hremiache, Lutskyi Raion, Volyn Oblast

Hremiache: 1,078 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.6% below the oblast median (1,084). #320 of 355 in the rayon, #699 of 1120 in the oblast.

Lutsk, the rayon centre, is 42 km away. 175 m above sea level. 32 km away: Rivne, the nearest bigger centre, 1,094 — 1.5% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 32 km. 13.21 m between rows, pitch 16.98 m (latitude 50.8°).

Yield of 1 kWp
1,078kWh/year
Tilt
38°1° east of south
10 kW
10,780kWh/year
Row pitch
16.98m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Hremiache

The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 32 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

34Jan53Feb91Mar117Apr128May134Jun135Jul134Aug107Sep79Oct36Nov28Dec

July: 135 kWh/kWp, December: 28 — 4.8 times less.

March: 91 against 94 in the oblast, 3.2% less.

Hremiache: plants, kWh
kWpA yearJulyDecember
55,390675140
1010,7801,350280
1516,1702,025420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lutskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.