Solar plant: site data

Solar power plant in Bashlyky, Lutskyi Raion, Volyn Oblast

Bashlyky: 1,079 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 0.5% below the oblast median (1,084). #315 of 355 in the rayon, #690 of 1120 in the oblast.

Lutsk, the rayon centre, is 36 km away. 185 m above sea level. 36 km away: Lutsk, the nearest bigger centre, 1,090 — 1.1% less here. Snow and wind from the nearest regional centre in the DBN — Рівне, 36 km. 13.20 m between rows, pitch 16.97 m (latitude 50.8°).

Yield of 1 kWp
1,079kWh/year
Tilt
38°1° east of south
10 kW
10,787kWh/year
Row pitch
16.97m · GCR 0.28
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,320 / 520Pa

Ground frame designer

A ground frame for a solar plant: Bashlyky

The designer opens with this place’s coordinates, latitude 50.8° for the row spacing and the DBN loads of the nearest regional centre — Рівне, 36 km: snow 1,320 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

35Jan53Feb92Mar117Apr128May134Jun135Jul134Aug107Sep79Oct36Nov28Dec

July: 135 kWh/kWp, December: 28 — 4.8 times less.

January: 35 against 33 in the oblast, 6.1% more.

Bashlyky: plants, kWh
kWpA yearJulyDecember
55,394675140
1010,7871,350280
1516,1812,025420

Snow and wind: Рівне

Example: a 10 kW ground frame

For the loads of Rivne: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lutskyi RaionVolyn Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.