Solar plant: site data

Solar power plant in Posukhiv, Mohyliv-Podilskyi Raion, Vinnytsia Oblast

Posukhiv: 1,148 kWh per kWp a year, tilt 36° 1° east of south (PVGIS). Exactly the oblast median (1,143). #122 of 158 in the rayon, #466 of 1206 in the oblast.

Mohyliv-Podilskyy, the rayon centre, is 39 km away. 266 m above sea level. 39 km away: Vinkivtsi, the nearest bigger centre, 1,127 — 1.8% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 85 km. 10.76 m between rows, pitch 14.63 m (latitude 48.8°).

Yield of 1 kWp
1,148kWh/year
Tilt
36°1° east of south
10 kW
11,475kWh/year
Row pitch
14.63m · GCR 0.33
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Posukhiv

The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 85 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan53Feb94Mar120Apr139May140Jun144Jul142Aug116Sep88Oct41Nov33Dec

July: 144 kWh/kWp, December: 33 — 4.4 times less.

January: 37 against 36 in the oblast, 4.2% more.

Posukhiv: plants, kWh
kWpA yearJulyDecember
55,738720165
1011,4751,440330
1517,2132,160495

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mohyliv-Podilskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.