Solar plant: site data

Solar power plant in Petrymany, Mohyliv-Podilskyi Raion, Vinnytsia Oblast

Petrymany: 1,137 kWh per kWp a year, tilt 36° 1° west of south (PVGIS). 0.5% below the oblast median (1,143). #149 of 158 in the rayon, #716 of 1206 in the oblast.

Mohyliv-Podilskyy, the rayon centre, is 44 km away. 208 m above sea level. 34 km away: Vinkivtsi, the nearest bigger centre, 1,127 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Хмельницький, 80 km. 10.77 m between rows, pitch 14.64 m (latitude 48.8°).

Yield of 1 kWp
1,137kWh/year
Tilt
36°1° west of south
10 kW
11,369kWh/year
Row pitch
14.64m · GCR 0.33
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,340 / 500Pa

Ground frame designer

A ground frame for a solar plant: Petrymany

The designer opens with this place’s coordinates, latitude 48.8° for the row spacing and the DBN loads of the nearest regional centre — Хмельницький, 80 km: snow 1,340 Pa, wind 500 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

36Jan52Feb95Mar120Apr138May139Jun143Jul141Aug115Sep87Oct41Nov31Dec

July: 143 kWh/kWp, December: 31 — 4.6 times less.

March: 95 against 92 in the oblast, 3.3% more.

Petrymany: plants, kWh
kWpA yearJulyDecember
55,685715155
1011,3691,430310
1517,0542,145465

Snow and wind: Хмельницький

Example: a 10 kW ground frame

For the loads of Khmelnytskyi: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Mohyliv-Podilskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.