Solar plant: site data

Solar power plant in Horodkivka, Tulchynskyi Raion, Vinnytsia Oblast

Horodkivka: 1,157 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.2% above the oblast median (1,143). #97 of 184 in the rayon, #222 of 1206 in the oblast.

Tulchyn, the rayon centre, is 35 km away. 229 m above sea level. 35 km away: Tulchyn, the nearest bigger centre, the same 1,156. Snow and wind from the nearest regional centre in the DBN — Вінниця, 96 km. 10.48 m between rows, pitch 14.35 m (latitude 48.4°).

Yield of 1 kWp
1,157kWh/year
Tilt
36°2° east of south
10 kW
11,567kWh/year
Row pitch
14.35m · GCR 0.33
T_min
-42 °Cregion II, south-eastern
Snow S₀ / wind W₀
1,360 / 470Pa

Ground frame designer

A ground frame for a solar plant: Horodkivka

The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 96 km: snow 1,360 Pa, wind 470 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan52Feb95Mar121Apr137May140Jun145Jul144Aug117Sep91Oct45Nov32Dec

July: 145 kWh/kWp, December: 32 — 4.5 times less.

November: 45 against 41 in the oblast, 9.8% more.

Horodkivka: plants, kWh
kWpA yearJulyDecember
55,784725160
1011,5671,450320
1517,3512,175480

Snow and wind: Вінниця

Example: a 10 kW ground frame

For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Tulchynskyi RaionVinnytsia Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.