Solar plant: site data
Solar power plant in Andriiashivka, Tulchynskyi Raion, Vinnytsia Oblast
Andriiashivka: 1,155 kWh per kWp a year, tilt 36° 2° east of south (PVGIS). 1.1% above the oblast median (1,143). #111 of 184 in the rayon, #249 of 1206 in the oblast.
Tulchyn, the rayon centre, is 32 km away. 186 m above sea level. 32 km away: Tulchyn, the nearest bigger centre, the same 1,156. Snow and wind from the nearest regional centre in the DBN — Вінниця, 93 km. 10.50 m between rows, pitch 14.37 m (latitude 48.4°).
- Yield of 1 kWp
- 1,155kWh/year
- Tilt
- 36°2° east of south
- 10 kW
- 11,552kWh/year
- Row pitch
- 14.37m · GCR 0.33
- T_min
- -42 °Cregion II, south-eastern
- Snow S₀ / wind W₀
- 1,360 / 470Pa
Ground frame designer
A ground frame for a solar plant: Andriiashivka
The designer opens with this place’s coordinates, latitude 48.4° for the row spacing and the DBN loads of the nearest regional centre — Вінниця, 93 km: snow 1,360 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 145 kWh/kWp, December: 33 — 4.4 times less.
November: 44 against 41 in the oblast, 7.3% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,776 | 725 | 165 |
| 10 | 11,552 | 1,450 | 330 |
| 15 | 17,328 | 2,175 | 495 |
Example: a 10 kW ground frame
For the loads of Vinnytsia: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.
How these numbers are computed
Nearby
- Vysoka Hreblia2 km1,155 kWh/kWp
- Krynychky2 km1,156 kWh/kWp
- Kisnytsia3 km1,154 kWh/kWp
- Antonova3 km1,154 kWh/kWp
- Horby3 km1,156 kWh/kWp
- Horodkivka4 km1,157 kWh/kWp
All places: Tulchynskyi RaionVinnytsia Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.