Solar power plant in Synkiv, Chortkivskyi Raion, Ternopil Oblast
Synkiv: 1,136 kWh per kWp a year, tilt 37° facing south (PVGIS). 4.0% above the oblast median (1,093). #10 of 296 in the rayon, #10 of 744 in the oblast.
Chortkiv, the rayon centre, is 46 km away. 174 m above sea level. 14 km away: Zastavna, the nearest bigger centre, the same 1,131. Snow and wind from the nearest regional centre in the DBN — Чернівці, 36 km. 10.91 m between rows, pitch 14.73 m (latitude 48.6°).
- Yield of 1 kWp
- 1,136kWh/year
- Tilt
- 37°facing south
- 10 kW
- 11,358kWh/year
- Row pitch
- 14.73m · GCR 0.32
- T_min
- -38 °Cregion IIIA, Carpathian
- Snow S₀ / wind W₀
- 1,320 / 500Pa
Ground frame designer
A ground frame for a solar plant: Synkiv
The designer opens with this place’s coordinates, latitude 48.6° for the row spacing and the DBN loads of the nearest regional centre — Чернівці, 36 km: snow 1,320 Pa, wind 500 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 139 kWh/kWp, December: 35 — 4.0 times less.
January: 44 against 34 in the oblast, 29.4% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,679 | 695 | 175 |
| 10 | 11,358 | 1,390 | 350 |
| 15 | 17,037 | 2,085 | 525 |
Example: a 10 kW ground frame
For the loads of Chernivtsi: 11.16 kWp, 18 panels, 412 kg of steel, 16 piles, materials ≈ 54,638 UAH.
How these numbers are computed
Nearby
- Bridok1 km1,135 kWh/kWp
- Mytkiv4 km1,131 kWh/kWp
- Zazulyntsi4 km1,124 kWh/kWp
- Kolodribka5 km1,133 kWh/kWp
- Vikno5 km1,132 kWh/kWp
- Vygoda5 km1,130 kWh/kWp
All places: Chortkivskyi RaionTernopil Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.