Solar power plant in Naraiv, Ternopilskyi Raion, Ternopil Oblast

Naraiv: 1,086 kWh per kWp a year, tilt 37° 1° west of south (PVGIS). 0.6% below the oblast median (1,093). #146 of 313 in the rayon, #471 of 744 in the oblast.

Ternopil, the rayon centre, is 59 km away. 346 m above sea level. 15 km away: Berezhany, the nearest bigger centre, 1,094 — 0.7% less here. Snow and wind from the nearest regional centre in the DBN — Тернопіль, 59 km. 11.66 m between rows, pitch 15.48 m (latitude 49.5°).

Yield of 1 kWp
1,086kWh/year
Tilt
37°1° west of south
10 kW
10,863kWh/year
Row pitch
15.48m · GCR 0.31
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,390 / 520Pa

Ground frame designer

A ground frame for a solar plant: Naraiv

The designer opens with this place’s coordinates, latitude 49.5° for the row spacing and the DBN loads of the nearest regional centre — Тернопіль, 59 km: snow 1,390 Pa, wind 520 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan57Feb93Mar113Apr125May127Jun134Jul132Aug108Sep83Oct42Nov32Dec

July: 134 kWh/kWp, December: 32 — 4.2 times less.

January: 40 against 34 in the oblast, 17.6% more.

Naraiv: plants, kWh
kWpA yearJulyDecember
55,432670160
1010,8631,340320
1516,2952,010480

Snow and wind: Тернопіль

Example: a 10 kW ground frame

For the loads of Ternopil: 11.16 kWp, 18 panels, 415 kg of steel, 16 piles, materials ≈ 55,054 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Ternopilskyi RaionTernopil Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.