Solar plant: site data

Solar power plant in Uborok, Shostkynskyi Raion, Sumy Oblast

Uborok: 1,093 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.5% below the oblast median (1,110). #144 of 258 in the rayon, #1383 of 1534 in the oblast.

Shostka, the rayon centre, is 42 km away. 184 m above sea level. 42 km away: Shostka, the nearest bigger centre, 1,082 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 150 km. 15.11 m between rows, pitch 18.83 m (latitude 52.1°).

Yield of 1 kWp
1,093kWh/year
Tilt
39°2° east of south
10 kW
10,927kWh/year
Row pitch
18.83m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Uborok

The designer opens with this place’s coordinates, latitude 52.1° for the row spacing and the DBN loads of the nearest regional centre — Суми, 150 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

40Jan62Feb101Mar114Apr137May140Jun137Jul134Aug104Sep69Oct32Nov24Dec

June: 140 kWh/kWp, December: 24 — 5.8 times less.

January: 40 against 36 in the oblast, 11.1% more.

Uborok: plants, kWh
kWpA yearJuneDecember
55,464700120
1010,9271,400240
1516,3912,100360

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.