Solar power plant in Chernatske, Shostkynskyi Raion, Sumy Oblast

Chernatske: 1,090 kWh per kWp a year, tilt 39° 2° east of south (PVGIS). 1.7% below the oblast median (1,110). #157 of 258 in the rayon, #1405 of 1534 in the oblast.

Shostka, the rayon centre, is 47 km away. 169 m above sea level. 47 km away: Shostka, the nearest bigger centre, 1,082 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 154 km. 15.17 m between rows, pitch 18.89 m (latitude 52.2°).

Yield of 1 kWp
1,090kWh/year
Tilt
39°2° east of south
10 kW
10,903kWh/year
Row pitch
18.89m · GCR 0.25
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Chernatske

The designer opens with this place’s coordinates, latitude 52.2° for the row spacing and the DBN loads of the nearest regional centre — Суми, 154 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

39Jan59Feb100Mar115Apr138May140Jun138Jul134Aug104Sep69Oct32Nov23Dec

June: 140 kWh/kWp, December: 23 — 6.1 times less.

November: 32 against 35 in the oblast, 8.6% less.

Chernatske: plants, kWh
kWpA yearJuneDecember
55,452700115
1010,9031,400230
1516,3552,100345

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.