Solar plant: site data

Solar power plant in Sydorivka, Shostkynskyi Raion, Sumy Oblast

Sydorivka: 1,096 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.3% below the oblast median (1,110). #98 of 258 in the rayon, #1324 of 1534 in the oblast.

Shostka, the rayon centre, is 67 km away. 164 m above sea level. 67 km away: Shostka, the nearest bigger centre, 1,082 — 1.3% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 94 km. 14.25 m between rows, pitch 18.02 m (latitude 51.7°).

Yield of 1 kWp
1,096kWh/year
Tilt
38°1° east of south
10 kW
10,955kWh/year
Row pitch
18.02m · GCR 0.27
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,670 / 420Pa

Ground frame designer

A ground frame for a solar plant: Sydorivka

The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 94 km: snow 1,670 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

37Jan59Feb93Mar115Apr141May143Jun140Jul137Aug107Sep70Oct34Nov20Dec

June: 143 kWh/kWp, December: 20 — 7.2 times less.

December: 20 against 23 in the oblast, 13.0% less.

Sydorivka: plants, kWh
kWpA yearJuneDecember
55,478715100
1010,9551,430200
1516,4332,145300

Snow and wind: Суми

Example: a 10 kW ground frame

For the loads of Sumy: 11.16 kWp, 18 panels, 385 kg of steel, 12 piles, materials ≈ 51,876 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Shostkynskyi RaionSumy Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.