Solar plant: site data
Solar power plant in Bila Bereza, Shostkynskyi Raion, Sumy Oblast
Bila Bereza: 1,092 kWh per kWp a year, tilt 38° 1° east of south (PVGIS). 1.6% below the oblast median (1,110). #148 of 258 in the rayon, #1391 of 1534 in the oblast.
Shostka, the rayon centre, is 62 km away. 167 m above sea level. 62 km away: Shostka, the nearest bigger centre, 1,082 — 1.0% more here. Snow and wind from the nearest regional centre in the DBN — Суми, 96 km. 14.25 m between rows, pitch 18.02 m (latitude 51.7°).
- Yield of 1 kWp
- 1,092kWh/year
- Tilt
- 38°1° east of south
- 10 kW
- 10,921kWh/year
- Row pitch
- 18.02m · GCR 0.27
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,670 / 420Pa
Ground frame designer
A ground frame for a solar plant: Bila Bereza
The designer opens with this place’s coordinates, latitude 51.7° for the row spacing and the DBN loads of the nearest regional centre — Суми, 96 km: snow 1,670 Pa, wind 420 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
June: 142 kWh/kWp, December: 20 — 7.1 times less.
December: 20 against 23 in the oblast, 13.0% less.
| kWp | A year | June | December |
|---|---|---|---|
| 5 | 5,461 | 710 | 100 |
| 10 | 10,921 | 1,420 | 200 |
| 15 | 16,381 | 2,130 | 300 |
Example: a 10 kW ground frame
For the loads of Sumy: 11.16 kWp, 18 panels, 359 kg of steel, 12 piles, materials ≈ 53,991 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.