Solar plant: site data

Solar power plant in Tylove, Sevastopol City

Tylove: 1,327 kWh per kWp a year, tilt 34° 1° west of south (PVGIS). Exactly the oblast median (1,333). #23 of 42 in the oblast.

298 m above sea level. 25 km away: Sevastopol, the nearest bigger centre, 1,372 — 3.3% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 259 km. 7.79 m between rows, pitch 11.76 m (latitude 44.4°).

Yield of 1 kWp
1,327kWh/year
Tilt
34°1° west of south
10 kW
13,272kWh/year
Row pitch
11.76m · GCR 0.41
T_min
-20 °Cregion IV, Southern coast of Crimea
Snow S₀ / wind W₀
760 / 480Pa

Ground frame designer

A ground frame for a solar plant: Tylove

The designer opens with this place’s coordinates, latitude 44.4° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 259 km: snow 760 Pa, wind 480 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

49Jan68Feb108Mar134Apr149May152Jun161Jul159Aug132Sep104Oct66Nov44Dec

July: 161 kWh/kWp, December: 44 — 3.7 times less.

December: 44 against 51 in the oblast, 13.7% less.

Tylove: plants, kWh
kWpA yearJulyDecember
56,636805220
1013,2721,610440
1519,9082,415660

Snow and wind: Херсон

Example: a 10 kW ground frame

For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

Sevastopol City: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.