Solar plant: site data
Solar power plant in Shyroke, Sevastopol City
Shyroke: 1,300 kWh per kWp a year, tilt 35° 3° east of south (PVGIS). 2.4% below the oblast median (1,333). #28 of 42 in the oblast.
300 m above sea level. 24 km away: Sevastopol, the nearest bigger centre, 1,372 — 5.2% less here. Snow and wind from the nearest regional centre in the DBN — Херсон, 256 km. 8.01 m between rows, pitch 11.93 m (latitude 44.5°).
- Yield of 1 kWp
- 1,300kWh/year
- Tilt
- 35°3° east of south
- 10 kW
- 13,003kWh/year
- Row pitch
- 11.93m · GCR 0.40
- T_min
- -20 °Cregion IV, Southern coast of Crimea
- Snow S₀ / wind W₀
- 760 / 480Pa
Ground frame designer
A ground frame for a solar plant: Shyroke
The designer opens with this place’s coordinates, latitude 44.5° for the row spacing and the DBN loads of the nearest regional centre — Херсон, 256 km: snow 760 Pa, wind 480 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 153 kWh/kWp, December: 51 — 3.0 times less.
September: 127 against 133 in the oblast, 4.5% less.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 6,502 | 765 | 255 |
| 10 | 13,003 | 1,530 | 510 |
| 15 | 19,505 | 2,295 | 765 |
Example: a 10 kW ground frame
For the loads of Kherson: 11.16 kWp, 18 panels, 349 kg of steel, 12 piles, materials ≈ 47,980 UAH.
How these numbers are computed
Nearby
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.