Solar plant: site data

Solar power plant in Tretiakove, Lubenskyi Raion, Poltava Oblast

Tretiakove: 1,136 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,142). #136 of 346 in the rayon, #1239 of 1856 in the oblast.

Lubny, the rayon centre, is 29 km away. 137 m above sea level. 29 km away: Lubny, the nearest bigger centre, 1,146 — 0.9% less here. Snow and wind from the nearest regional centre in the DBN — Черкаси, 86 km. 11.87 m between rows, pitch 15.69 m (latitude 49.8°).

Yield of 1 kWp
1,136kWh/year
Tilt
37°2° east of south
10 kW
11,362kWh/year
Row pitch
15.69m · GCR 0.30
T_min
-40 °Cregion I, north-western
Snow S₀ / wind W₀
1,520 / 420Pa

Ground frame designer

A ground frame for a solar plant: Tretiakove

The designer opens with this place’s coordinates, latitude 49.8° for the row spacing and the DBN loads of the nearest regional centre — Черкаси, 86 km: snow 1,520 Pa, wind 420 Pa.

  • No sign-up
  • Snow and wind check
  • Drawings and estimate

Yield by month

33Jan54Feb91Mar119Apr140May144Jun148Jul145Aug116Sep84Oct38Nov25Dec

July: 148 kWh/kWp, December: 25 — 5.9 times less.

January: 33 against 35 in the oblast, 5.7% less.

Tretiakove: plants, kWh
kWpA yearJulyDecember
55,681740125
1011,3621,480250
1517,0432,220375

Snow and wind: Черкаси

Example: a 10 kW ground frame

For the loads of Cherkasy: 11.16 kWp, 18 panels, 372 kg of steel, 12 piles, materials ≈ 49,705 UAH.

The whole frame: drawing, BOM, checks

How these numbers are computed

Nearby

All places: Lubenskyi RaionPoltava Oblast: rayons and towns

Free calculators

Sources

Preliminary calculation: a design needs an engineer’s check.