Solar plant: site data
Solar power plant in Shakhvorostivka, Myrhorodskyi Raion, Poltava Oblast
Shakhvorostivka: 1,142 kWh per kWp a year, tilt 37° 2° east of south (PVGIS). Exactly the oblast median (1,142). #59 of 430 in the rayon, #907 of 1856 in the oblast.
Myrhorod, the rayon centre, is 9 km away. 142 m above sea level. 9 km away: Myrhorod, the nearest bigger centre, 1,133 — 0.8% more here. Snow and wind from the nearest regional centre in the DBN — Полтава, 88 km. 12.08 m between rows, pitch 15.90 m (latitude 50.0°).
- Yield of 1 kWp
- 1,142kWh/year
- Tilt
- 37°2° east of south
- 10 kW
- 11,422kWh/year
- Row pitch
- 15.90m · GCR 0.30
- T_min
- -40 °Cregion I, north-western
- Snow S₀ / wind W₀
- 1,450 / 470Pa
Ground frame designer
A ground frame for a solar plant: Shakhvorostivka
The designer opens with this place’s coordinates, latitude 50.0° for the row spacing and the DBN loads of the nearest regional centre — Полтава, 88 km: snow 1,450 Pa, wind 470 Pa.
- No sign-up
- Snow and wind check
- Drawings and estimate
Yield by month
July: 147 kWh/kWp, December: 25 — 5.9 times less.
January: 37 against 35 in the oblast, 5.7% more.
| kWp | A year | July | December |
|---|---|---|---|
| 5 | 5,711 | 735 | 125 |
| 10 | 11,422 | 1,470 | 250 |
| 15 | 17,133 | 2,205 | 375 |
Example: a 10 kW ground frame
For the loads of Poltava: 11.16 kWp, 18 panels, 389 kg of steel, 12 piles, materials ≈ 52,358 UAH.
How these numbers are computed
Nearby
- Malynivka2 km1,140 kWh/kWp
- Trudoliub3 km1,143 kWh/kWp
- Liubivshchyna4 km1,136 kWh/kWp
- Dibrivka5 km1,142 kWh/kWp
- Kybyntsi5 km1,145 kWh/kWp
- Derkachi6 km1,143 kWh/kWp
All places: Myrhorodskyi RaionPoltava Oblast: rayons and towns
Free calculators
Sources
- PVGIS © European Union, 2001–2026 — yield, tilt and azimuth, data as of 2026-10-10
- GeoNames (CC BY 4.0) — coordinates, elevation and divisions (changed)
- DBN V.1.2-2:2006, DSTU-N B V.1.1-27:2010
- How these numbers are computed
Preliminary calculation: a design needs an engineer’s check.